# Title Funder Funding Start End Status
81 Advancing Biotechnologies for Fuel Generation: Exploiting Transmembrane Cytochromes for Solar Energy Conversion BBSRC
£1,887,215
June 29, 2013 Dec. 29, 2016 Closed
82 EPSRC Centre for Doctoral Training in Fuel Cells and their Fuels - Clean Power for the 21st Century EPSRC
£8,939,326
March 31, 2014 Feb. 28, 2023 Active
83 EPSRC Centre for Doctoral Training in Fuel Cells and their Fuels - Clean Power for the 21st Century EPSRC
£22,432,410
March 31, 2014 Feb. 28, 2023 Closed
84 Hydrogen Enrichment of Natural Gas by Methane Cracking EPSRC
£0
Sept. 30, 2019 Jan. 31, 2024 Active
85 Design and high throughput microwave synthesis of Li-ion battery materials EPSRC
£733,012
Sept. 30, 2018 Dec. 31, 2021 Closed
86 Design and high throughput microwave synthesis of Li-ion battery materials EPSRC
£2,442,164
Sept. 30, 2015 Sept. 29, 2018 Closed
87 Design and high throughput microwave synthesis of Li-ion battery materials EPSRC
£1,832,530
Sept. 30, 2018 Dec. 31, 2021 Closed
88 Design and high throughput microwave synthesis of Li-ion battery materials EPSRC
£6,105,410
Sept. 30, 2015 Sept. 30, 2018 Closed
89 Systems biology of the butanol-producing Clostridium acetobutylicum: new source of biofuel and chemicals/COSMIC2 BBSRC
£905,388
Sept. 30, 2010 Dec. 31, 2013 Closed
90 Systems biology of the butanol-producing Clostridium acetobutylicum: new source of biofuel and chemicals/COSMIC2 BBSRC
£2,263,470
Sept. 30, 2010 Dec. 31, 2013 Closed
91 Microwave-assisted upgrading of fast pyrolysis bio-oil using structured zeolites on microwave-absorbing foam supports EPSRC
£397,718
Nov. 1, 2017 Oct. 31, 2019 Closed
92 Microwave-assisted upgrading of fast pyrolysis bio-oil using structured zeolites on microwave-absorbing foam supports EPSRC
£994,295
Nov. 1, 2017 Oct. 31, 2019 Closed
Reset