# Title Funder Funding Start End Status
1 National Clean Maritime Demonstration Hub Innovate UK
£563,210
Aug. 31, 2021 March 30, 2022 Active
2 National Clean Maritime Demonstration Hub Innovate UK
£1,379,860
Aug. 31, 2021 March 31, 2022 Closed
3 Transition to hydrogen powered ocean-going and short-sea shipping with enabling retrofit technologies (TransShip) Innovate UK
£576,011
Aug. 31, 2021 March 30, 2022 Closed
4 Transition to hydrogen powered ocean-going and short-sea shipping with enabling retrofit technologies (TransShip) Innovate UK
£2,880,055
Aug. 31, 2021 March 31, 2022 Closed
5 Methanol powered zero-carbon vessel design study Innovate UK
£323,161
Sept. 30, 2022 Sept. 29, 2023 Active
6 Methanol powered zero-carbon vessel design study Innovate UK
£1,615,805
Sept. 30, 2022 Sept. 30, 2023 Closed
7 BRAMBUS Feasibility Innovate UK
£346,582
Aug. 31, 2021 March 30, 2022 Closed
8 BRAMBUS Feasibility Innovate UK
£866,455
Aug. 31, 2021 March 31, 2022 Closed
9 Shetland Rural Energy Hub Innovate UK
£263,240
March 31, 2023 June 30, 2023 Closed
10 Techno-economic feasibility assessment of CO2 capture and utilistation from cement manafacturing EPSRC
£0
Feb. 1, 2019 July 30, 2022 Active
11 Heat as a Service for Retrofit Innovate UK
£119,800
Sept. 30, 2020 Dec. 31, 2020 Closed
12 Heat as a Service for Retrofit Innovate UK
£299,500
Sept. 30, 2020 Dec. 31, 2020 Closed
13 CLIPPER 2.0: ECONOMICAL AND TECHNICAL FEASIBILITY OF DECARBONISATION HIGH-SPEED PUBLIC WATER TRANSPORT ON THE RIVER THAMES Innovate UK
£107,887
Aug. 31, 2021 March 30, 2022 Closed
14 Offshore Wind Charge Station Innovate UK
£119,624
Sept. 30, 2020 Dec. 31, 2020 Closed
15 Offshore Wind Charge Station Innovate UK
£299,060
Sept. 30, 2020 Dec. 31, 2020 Closed
16 Development of a new generation of high efficiency heat pumps using pre-heated air supply Innovate UK
£139,988
Sept. 30, 2016 Sept. 29, 2017 Closed
17 Development of a new generation of high efficiency heat pumps using pre-heated air supply Innovate UK
£349,970
Sept. 30, 2016 Sept. 30, 2017 Closed
18 Freeport East Energy Hub Feasibility Study Innovate UK
£380,662
Aug. 31, 2021 March 30, 2022 Closed
19 Freeport East Energy Hub Feasibility Study Innovate UK
£951,655
Aug. 31, 2021 March 31, 2022 Closed
20 Hydrogen Fuel Cell Range Extender Innovate UK
£10,003,055
Jan. 1, 2023 Nov. 30, 2023 Active
Reset