Home Projects More like: Moving towards sustainable development: environmental valuation and policies in Chile [Clear] # Title Funder Funding Start End Status 81 Geological safety and optimisation in mining operations: towards a new understanding of fracture damage, heterogeneity and anisotropy. NERC £342,925 July 31, 2021 Dec. 31, 2023 Active 82 Purchase of a tandem LA-LIBS femtosecond laser system for the UK NERC £1,910,760 Jan. 22, 2021 Dec. 31, 2021 Closed 83 CaLby2030: Calcium Looping to Capture CO2 from Industrial Processes by 2030 Horizon Europe Guarantee £2,362,305 Sept. 30, 2022 March 31, 2026 Active 84 The Economics of Biodiversity Additionality (BIOADD) NERC £811,615 Aug. 10, 2022 Aug. 9, 2025 Active 85 REACT (Renewable Energy Access for the Conversion of Tuk-tuks) Innovate UK £1,273,645 March 31, 2023 June 30, 2024 Active 86 The importance of visual impact on public acceptance of renewable and non-conventional energy sources NERC £0 Sept. 30, 2016 Jan. 31, 2021 Closed 87 Better Air-quality, Free Energy, Environmental Sustainability and Higher Animal Productivity; Four Birds with One Stone EPSRC £0 Sept. 30, 2021 Sept. 29, 2025 Active 88 Understanding how servitization can impact UK economic productivity and environmental performance ESRC £1,512,864 June 30, 2022 June 29, 2025 Active 89 Adaptive Governance for Energy System dDecentralization: A case study of the National Electricity Market in eastern Australia EPSRC £0 Sept. 30, 2016 May 31, 2020 Closed 90 Greenhouse gas mitigation from Chinese agriculture (technical potential, economic efficiency and equity impacts) NERC £225,035 June 30, 2010 Nov. 30, 2010 Closed 91 OpenSwarm: Orchestration and Programming ENergy-aware and collaborative Swarms With AI-powered Reliable Methods Horizon Europe Guarantee £2,318,495 Jan. 1, 2023 April 30, 2026 Active 92 A Feasibility Study on Integrating Electric Buses with Waste Gasification for a Green Public Transport System and Solid Waste Management EPSRC £0 Sept. 30, 2018 June 30, 2022 Active 93 A Feasibility Study on Integrating Electric Buses with Waste Gasification for a Green Public Transport System and Solid Waste Management EPSRC, NERC £0 Sept. 30, 2018 July 1, 2022 Closed 94 Multi-energy Control of Cyber-Physical Urban Energy Systems (MC2) EPSRC £1,625,486 March 31, 2020 Sept. 29, 2023 Active 95 Multi-energy Control of Cyber-Physical Urban Energy Systems (MC2) EPSRC £4,063,715 March 31, 2020 March 31, 2024 Active 96 Electric vehicle charging and energy storage system (EVC-EES) to combine electrification of transport to global electricity access in a rural area of Rwanda connected to a mini-grid Innovate UK £122,896 March 31, 2020 Sept. 29, 2020 Closed 97 To develop a non-equilibrium wet steam throughflow calculation method, including modelling of all the loss-generating two-phase phenomena EPSRC £0 Sept. 30, 2016 March 30, 2021 Closed 98 To develop a non-equilibrium wet steam throughflow calculation method, including modelling of all the loss-generating two-phase phenomena EPSRC £0 Sept. 30, 2016 March 30, 2021 Closed 99 Multi-sectoral interactions in global energy end-use EPSRC £1,157,400 Jan. 1, 2013 Dec. 31, 2015 Closed 100 Thermochemical energy storage systems: mathematical modelling and experimental evaluation of materials and prototype systems performance EPSRC £0 Jan. 1, 2022 June 29, 2025 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »