# Title Funder Funding Start End Status
1 Continuous Hydrothermal Synthesis of Nanomaterials: From Laboratory to Pilot Plant EPSRC
£1,031,918
May 31, 2008 Nov. 30, 2011 Closed
2 Nanocrystalline Water Splitting Photodiodes II; Device Engineering, Integration and Scale-up EPSRC
£1,225,468
April 30, 2011 Oct. 31, 2014 Closed
3 Nanocrystalline Water Splitting Photodiodes II; Device Engineering, Integration and Scale-up EPSRC
£3,063,670
April 30, 2011 Oct. 31, 2014 Closed
4 QualiNet - Automated in- line inspection and quality control of net shape powder metallurgy components... EPSRC
£673,098
March 1, 2014 Feb. 28, 2017 Closed
5 Automated in- line inspection and quality control of net shape powder metallurgy components using microfocus three dimensional x ray computed tomagraphy imaging (Qualinet) Innovate UK
£1,043,816
March 1, 2014 Feb. 28, 2017 Closed
6 High Power Energy Storage: New Materials for Large Format Supercapacitors EPSRC
£0
Oct. 1, 2017 Sept. 29, 2021 Closed
7 Exploring Cathode and Solid Electrolyte Materials for All-solid-state Battery Applications EPSRC
£0
Jan. 1, 2017 Dec. 31, 2019 Closed
8 High throughput manufacture of hierarchical Li-Ion battery materials UKRI
£129,270
Aug. 15, 2022 Feb. 15, 2024 Active
9 High throughput manufacture of hierarchical Li-Ion battery materials Horizon Europe Guarantee
£646,350
Aug. 15, 2022 Feb. 15, 2024 Active
10 ISCF Wave 1: (The JUICED Hub [Joint University Industry Consortium for Energy (Materials) and Devices Hub]) EPSRC
£3,664,442
Nov. 8, 2017 Nov. 6, 2021 Closed
11 ISCF Wave 1: (The JUICED Hub [Joint University Industry Consortium for Energy (Materials) and Devices Hub]) UUI
£9,161,105
Nov. 8, 2017 Nov. 6, 2021 Closed
12 Processing of nano copper materials for the production of conductive circuits EPSRC
£0
Sept. 30, 2016 March 30, 2020 Closed
13 Processing of nano copper materials for the production of conductive circuits EPSRC
£0
Sept. 30, 2016 March 31, 2020 Closed
14 On-line surface inspection of roll-to-roll film processing EPSRC
£187,336
April 30, 2013 Oct. 31, 2014 Closed
15 On-line surface inspection of roll-to-roll film processing EPSRC
£468,340
April 30, 2013 Oct. 31, 2014 Closed
16 SAFE Barriers - a Systems Approach For Engineered Barriers EPSRC
£6,696,985
Sept. 29, 2012 March 29, 2017 Closed
17 Sustainable transformation of metallic wastes from the steel industry into advanced zinc oxide Innovate UK
£97,712
Feb. 1, 2022 Jan. 31, 2023 Active
18 Mechanisms and Synthesis of Materials for Next-Generation Lithium Batteries Using Flame Spray Pyrolysis EPSRC
£775,978
Feb. 1, 2021 Jan. 31, 2024 Active
19 Mechanisms and Synthesis of Materials for Next-Generation Lithium Batteries Using Flame Spray Pyrolysis EPSRC
£1,601,962
April 30, 2020 April 29, 2024 Active
20 Mechanisms and Synthesis of Materials for Next-Generation Lithium Batteries Using Flame Spray Pyrolysis EPSRC
£1,939,945
Feb. 1, 2021 July 31, 2024 Active
Reset