Home Projects More like: The molecular interface of microbe-mineral electron transfer [Clear] # Title Funder Funding Start End Status 61 Production of high quality electron bunches in AWAKE Run 2 STFC £655,960 March 31, 2020 March 30, 2023 Active 62 Production of high quality electron bunches in AWAKE Run 2 STFC £572,566 March 31, 2020 March 30, 2023 Active 63 Production of high quality electron bunches in AWAKE Run 2 STFC £1,431,415 March 31, 2020 March 31, 2024 Active 64 Engineering the bacterium Rhodopseudomonas palustris as a platform for electrosynthetic bioproduction BBSRC £1,095,538 March 1, 2018 Jan. 28, 2023 Active 65 Engineering the bacterium Rhodopseudomonas palustris as a platform for electrosynthetic bioproduction BBSRC £2,748,810 March 1, 2018 Jan. 28, 2023 Closed 66 4D quantification of micro-scale feedbacks in dehydrating, deforming rocks NERC £3,237,355 Jan. 1, 2020 July 31, 2023 Closed 67 Beyond Luttinger Liquids-spin-charge separation at high excitation energies EPSRC £713,972 Oct. 14, 2012 April 13, 2015 Closed 68 14 NSFBIO:Identifying Mechanisms for Environmental Adaptation in CMNR Bacteria: A Systems Analysis of GeneRegulation of AlternativeSubstrateMetabolism BBSRC £850,736 Sept. 30, 2015 Sept. 29, 2019 Closed 69 14 NSFBIO:Identifying Mechanisms for Environmental Adaptation in CMNR Bacteria: A Systems Analysis of GeneRegulation of AlternativeSubstrateMetabolism BBSRC £2,126,840 Sept. 30, 2015 Sept. 30, 2019 Closed 70 Automated Mineral Analyser - Automated mineralogical analysis to underpin earth sciences NERC £600,000 Sept. 30, 2019 Sept. 29, 2020 Closed 71 Automated Mineral Analyser - Automated mineralogical analysis to underpin earth sciences NERC £1,500,000 Sept. 30, 2019 Sept. 30, 2020 Closed 72 Microbial carbon cycling under geological CO2 storage conditions: understanding the rules of life in the engineered subsurface BBSRC £4,837,025 Jan. 1, 2022 Dec. 31, 2026 Active 73 Microbial carbon cycling under geological CO2 storage conditions: understanding the rules of life in the engineered subsurface BBSRC £1,934,810 Jan. 1, 2022 Dec. 31, 2026 Active 74 Understanding genesis of HREE deposits through Experimental and Spectroscopic measurements and atomistic Simulations (REEXSS). NERC £152,430 Aug. 31, 2013 May 30, 2014 Closed 75 Beyond Biorecovery: environmental win-win by biorefining of metallic wastes into new functional materials NERC £140,630 March 31, 2013 Sept. 29, 2013 Closed 76 Earth's weathering reactor: carbon source or sink over short and long time-scales? NERC £1,109,000 July 12, 2017 Dec. 31, 2020 Closed 77 Energy and the Physical Sciences: Hydrogen Production using a Proton Electron Buffer EPSRC £733,380 Sept. 29, 2013 Sept. 28, 2017 Closed 78 Energy and the Physical Sciences: Hydrogen Production using a Proton Electron Buffer EPSRC £1,833,450 Sept. 29, 2013 Sept. 29, 2017 Closed 79 Determining the metabolic and molecular mechanisms to enhance magnetosome biomanufacturing BBSRC £881,210 Sept. 30, 2021 Sept. 29, 2024 Active 80 Processes governing semi-metal - PGE linkage in crustal magmatic systems: opportunities for discovery and recovery NERC £153,544 Aug. 31, 2013 June 29, 2014 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »