Home Projects More like: Data rich imaging approaches assessing early fatigue crack growth mechanisms in Ni base superalloys [Clear] # Title Funder Funding Start End Status 21 Innovative Forging and Fabrication Solutions for the Nuclear Industry EPSRC £690,050 May 31, 2015 Dec. 31, 2017 Closed 22 Predictive Modelling of the Fundamentals of Failure in Metals EPSRC £302,187 July 31, 2016 July 30, 2018 Closed 23 Processing effects on the structure and fatigue performance of nickel-based superalloys EPSRC £0 Sept. 23, 2018 Dec. 31, 2021 Closed 24 Heterogeneous case-carburised bearing steel microstructures EPSRC £0 Sept. 30, 2021 Sept. 29, 2025 Active 25 Understanding intermediate temperature fatigue crack growth in single crystal Ni-based superalloys EPSRC £0 Sept. 29, 2021 Sept. 29, 2025 Active 26 Fatigue Crack Growth in Complex Residual Stress Fields due to Surface Treatment and Foreign Object Damage under Simulated Flight Cycles EPSRC £555,894 Dec. 3, 2007 June 1, 2011 Closed 27 Fatigue Crack Growth in Complex Residual Stress Fields due to Surface Treatment and Foreign Object Damage under Simulated Flight Cycles EPSRC £177,708 Sept. 30, 2007 Sept. 29, 2010 Closed 28 To develop a non-equilibrium wet steam throughflow calculation method, including modelling of all the loss-generating two-phase phenomena EPSRC £0 Sept. 30, 2016 March 30, 2021 Closed 29 To develop a non-equilibrium wet steam throughflow calculation method, including modelling of all the loss-generating two-phase phenomena EPSRC £0 Sept. 30, 2016 March 30, 2021 Closed 30 The effect of corrosive environment on the crack growth behaviour of nickel based superalloys EPSRC £0 Sept. 30, 2021 Sept. 29, 2025 Active 31 Mechanical characterisation of CMSX-3 and CMSX-4 with PT and PTAL Coatings under thermo-mechanical fatigue loading conditions EPSRC £0 Sept. 30, 2021 Sept. 29, 2025 Active 32 Predictive Modelling of Small Crack Formation in Superalloys EPSRC £0 Sept. 27, 2020 Sept. 29, 2023 Active 33 Corrosion Damage Effects on the Structural Integrity Assessment of Offshore Structures EPSRC £0 Sept. 24, 2017 Dec. 31, 2021 Closed 34 Experimental and modelling methodologies for fatigue crack nucleation around non-metallic inclusions in polycrystalline Ni-base superalloy. EPSRC £0 Sept. 29, 2017 June 29, 2021 Closed 35 Extension to Transferability of Small-Specimen Data to Large-Scale Component Fracture Assessment (TRANSFER-EXT) EPSRC £79,815 June 30, 2016 Sept. 30, 2016 Closed 36 High Reliability Interconnects: New Methodologies for Lead-free Solders EPSRC £3,899,139 June 30, 2018 June 29, 2022 Closed 37 High reliability Interconnects: New Methodologies for Lead-free Solders EPSRC £211,818 June 30, 2018 June 29, 2022 Closed 38 Atomistic studies of dislocation-interface interactions in lamellar Ti-Al EPSRC £888,838 March 1, 2007 Feb. 28, 2011 Closed 39 Investigation into the fundamentals of contact mechanics in turbine blades roots to enable improved techniques for design optimisation and reliability EPSRC £0 Sept. 30, 2019 Sept. 29, 2022 Active 40 Understanding the mechanisms controlling low potential stress corrosion cracking in nuclear reactors EPSRC £7,063,555 Dec. 1, 2017 May 31, 2022 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »