Home Projects More like: Energy reduction and reduced cooling times for injection moulding of thermoplastics using microwave heating [Clear] # Title Funder Funding Start End Status 1 Energy reduction and reduced cooling times for injection moulding of thermoplastics using microwave heating Innovate UK £437,255 Sept. 30, 2013 Sept. 30, 2014 Closed 2 Ultramelt Flowsim - Developing an approach to model and demonstrate benefits to injection moulding, including 30% cycle time reduction and 28% energy use reduction Innovate UK £195,950 Nov. 1, 2020 July 30, 2021 Closed 3 A new design concept for a 25kW micro gas turbine for a hybrid car Innovate UK £10,000 Nov. 1, 2014 April 29, 2015 Closed 4 A Revolutionary Rotary Ericsson Heat Pump/Engine EPSRC £197,340 Sept. 30, 2016 Sept. 29, 2017 Closed 5 A Revolutionary Rotary Ericsson Heat Pump/Engine EPSRC £493,350 Sept. 30, 2016 Sept. 30, 2017 Closed 6 Thermochemical energy storage using a closed cycle (ThermoStore) EPSRC £1,045,512 Aug. 31, 2020 Aug. 30, 2023 Active 7 Thermochemical energy storage using a closed cycle (ThermoStore) EPSRC £2,613,780 Aug. 31, 2020 Feb. 29, 2024 Active 8 Dynamic Organic Rankine Cycle for Recovering Industrial Waste Heat EPSRC £196,960 Feb. 7, 2016 April 29, 2017 Closed 9 Dynamic Organic Rankine Cycle for Recovering Industrial Waste Heat EPSRC £492,400 Feb. 7, 2016 April 30, 2017 Closed 10 STEPCO2 Innovate UK £9,676,572 May 31, 2018 May 30, 2021 Closed 11 Deployment of ultrasonic melt flow enhancement technology to achieve energy savings of 27% across the energy intensive, injection moulded consumer packaging sector Innovate UK £5,542,770 March 1, 2022 Feb. 29, 2024 Active 12 Deployment of ultrasonic melt flow enhancement technology to achieve energy savings of 27% across the energy intensive, injection moulded food packaging sector Innovate UK £5,127,380 March 1, 2022 Feb. 29, 2024 Active 13 Zero-Carbon Emission Integrated Cooling, Heating and Power (ICHP) Networks EPSRC £2,303,080 June 30, 2021 June 29, 2024 Active 14 Zero-Carbon Emission Integrated Cooling, Heating and Power (ICHP) Networks EPSRC £5,757,700 June 30, 2021 March 31, 2025 Active 15 Gas-Fired Heat Pumps - Transforming the UK's Domestic Heating Sector EPSRC £195,638 Sept. 30, 2009 Sept. 29, 2010 Closed 16 Gas-Fired Heat Pumps - Transforming the UK's Domestic Heating Sector EPSRC £489,095 Sept. 30, 2009 Sept. 30, 2010 Closed 17 New microporous polymers for carbon dioxide selective membranes EPSRC £772,782 March 1, 2013 Dec. 31, 2013 Closed 18 New microporous polymers for carbon dioxide selective membranes EPSRC £1,440,450 Jan. 1, 2014 Feb. 29, 2016 Closed 19 New microporous polymers for carbon dioxide selective membranes EPSRC £1,931,955 March 1, 2013 Dec. 31, 2013 Closed 20 Optimisation of thermal energy storage in abandoned flooded mine workings EPSRC £0 Sept. 30, 2018 May 29, 2022 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »