Home Projects More like: Revolutionary Electric Vehicle Battery (REVB) - design and integration of novel state estimation/control algorithms & system optimisation techniques [Clear] # Title Funder Funding Start End Status 1 Flexible and modular large battery systems for safe on-board integration and operation of electric power, demonstrated in multiple type of ships (FLEXSHIP) Horizon Europe Guarantee £635,045 Jan. 1, 2023 Dec. 31, 2026 Active 2 Enabling the Cultural Shift to Materials 4.0 EPSRC £1,301,014 Nov. 1, 2021 March 30, 2022 Closed 3 Real-time Numerical Optimization in Reconfigurable Hardware with Application to Model-Predictive Control EPSRC £629,748 Aug. 31, 2009 Feb. 28, 2013 Closed 4 Real-time Numerical Optimization in Reconfigurable Hardware with Application to Model-Predictive Control EPSRC £1,054,552 May 31, 2009 Nov. 30, 2012 Closed 5 Wide-Area Instrumentation of Power Networks using Existing Infrastructure EPSRC £826,760 June 30, 2016 June 29, 2019 Closed 6 Wide-Area Instrumentation of Power Networks using Existing Infrastructure EPSRC £2,066,900 June 30, 2016 June 30, 2019 Closed 7 Data-Driven Sociotechnical Energy Management in Public Sector Buildings EPSRC £993,816 May 31, 2015 Nov. 30, 2018 Closed 8 Data-Driven Sociotechnical Energy Management in Public Sector Buildings EPSRC £2,484,540 May 31, 2015 Nov. 30, 2018 Closed 9 Revolutionary Electric Vehicle Battery (REVB) EPSRC £1,655,004 Jan. 1, 2014 May 4, 2017 Closed 10 Revolutionary Electric Vehicle Battery (REVB) EPSRC £4,137,510 Jan. 1, 2014 May 5, 2017 Closed 11 Structural Analysis and Optimisation of a Wave Energy Converter EPSRC £0 Aug. 31, 2019 Sept. 14, 2023 Closed 12 Energy Efficient Control EPSRC £858,214 Aug. 31, 2015 July 31, 2019 Closed 13 Pulse quietening at source for higher-frequency power and signal switching EPSRC £1,603,372 June 16, 2013 June 15, 2018 Closed 14 Dynamic Adaptation in Heterogeneous Multicore Embedded Processors EPSRC £2,435,114 Nov. 1, 2010 July 30, 2014 Closed 15 Indo - UK Civil Nuclear Collaboration on Damage and Radiation Effects in Amorphous Materials (DREAM) EPSRC £1,086,915 May 31, 2011 May 31, 2015 Closed 16 TorqTidal: Mitigating Torque Pulsations in Tidal Current Turbines EPSRC £200,696 Dec. 1, 2016 March 30, 2018 Closed 17 TorqTidal: Mitigating Torque Pulsations in Tidal Current Turbines EPSRC £501,740 Dec. 1, 2016 March 31, 2018 Closed 18 EnnCore: End-to-End Conceptual Guarding of Neural Architectures EPSRC £8,607,795 Feb. 1, 2021 July 31, 2024 Active 19 Border Patrol: Improving Smart Device Security through Type-Aware Systems Design EPSRC £8,828,795 Feb. 1, 2017 July 31, 2023 Closed 20 ELEVATE (ELEctrochemical Vehicle Advanced TEchnology) EPSRC £6,532,732 Jan. 13, 2015 July 11, 2019 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 »