Home Projects More like: Novel Pyro-Gasification Technology for Hydrogen Production from Solid Waste [Clear] # Title Funder Funding Start End Status 1 Novel Pyro-Gasification Technology for Hydrogen Production from Solid Waste EPSRC £0 Sept. 30, 2020 March 31, 2024 Active 2 High Quality Syngas from the Catalytic Gasification of Biomass Wastes EPSRC £778,028 Jan. 1, 2012 June 29, 2015 Closed 3 High Quality Syngas from the Catalytic Gasification of Biomass Wastes EPSRC £1,945,070 Jan. 1, 2012 June 30, 2015 Closed 4 Net-negative Emission Hydrogen production with BECCUS EPSRC £0 Sept. 30, 2022 March 30, 2026 Active 5 PyroGen - End of life plastic to oil pyrolysis for a closed loop energy from waste process Innovate UK £200,000 Jan. 1, 2016 Dec. 31, 2016 Closed 6 Closed Loop Carbon Cycle for food energy fuel waste and water Innovate UK £99,400 Feb. 1, 2013 May 30, 2013 Closed 7 Closed Loop Carbon Cycle for food energy fuel waste and water Innovate UK £248,500 Feb. 1, 2013 May 31, 2013 Closed 8 Novel low energy plasma/catalytic gas cleaning process to deliver high quality syngas from the gasification of waste biomass EPSRC £1,823,078 Jan. 1, 2015 Aug. 30, 2018 Closed 9 Increasing energy yield from the integration of anaerobic digestion and pyrolysis EPSRC £1,802,246 Sept. 29, 2013 Sept. 28, 2017 Closed 10 Increasing energy yield from the integration of anaerobic digestion and pyrolysis EPSRC £4,505,615 Sept. 29, 2013 Sept. 29, 2017 Closed 11 17-ERACoBioTech: Sustainable production of added value chemicals from SynGas-derived methanol through Systems and Synthetic Biology approaches BBSRC £853,042 April 30, 2018 Dec. 31, 2021 Closed 12 Pre-commercial technology validation of a clean cold renewable syngas production plant. EPSRC £162,492 May 31, 2016 May 30, 2017 Closed 13 Intensification of syngas cleaning and hydrogen separation EPSRC £301,784 June 8, 2008 June 7, 2010 Closed 14 Gasification of agricultural waste streams for the secure cooking gas supply of rural and isolated communities in Pakistan (GAS-SCRIPt) Innovate UK £1,144,575 March 31, 2023 March 31, 2024 Active 15 Carbon Capture Configurations For Biohydrogen Plant EPSRC £0 Sept. 30, 2022 Sept. 29, 2026 Active 16 Biomass Derived Transport Fuels via Fischer-Tropsch Synthesis EPSRC £0 March 31, 2016 Dec. 30, 2019 Closed 17 Intensified Integrated Bio-Refinery EPSRC £235,506 Oct. 15, 2006 April 14, 2008 Closed 18 Intensified Integrated Bio-Refinery EPSRC £315,116 Jan. 29, 2007 Jan. 28, 2009 Closed 19 Intensified Integrated Bio-Refinery EPSRC £192,518 Oct. 1, 2006 March 1, 2008 Closed 20 Intensified Integrated Bio-Refinery EPSRC £28,424 May 31, 2006 May 30, 2008 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »