# Title Funder Funding Start End Status
1 Optimum topology for power handling in dual bandpass filters EPSRC
£0
Aug. 31, 2016 Oct. 31, 2019 Closed
2 RF Energy Harvesting Communications EPSRC
£196,822
Dec. 22, 2014 Dec. 21, 2015 Closed
3 RF Energy Harvesting Communications EPSRC
£492,055
Dec. 22, 2014 Dec. 21, 2015 Closed
4 Novel Flexible Materials for Sustainable Energy Storage EPSRC
£0
Sept. 30, 2022 Sept. 30, 2026 Active
5 Optimal sensor deployment and data analytics for power distribution network visibility and control EPSRC, NERC
£0
Sept. 30, 2017 May 31, 2022 Closed
6 UK demonstration of superconducting RF cavity fabrication and industrialisation. STFC
£94,200
Dec. 4, 2009 Aug. 2, 2010 Closed
7 Optimal passive filter topology for advanced power electronics converters EPSRC
£0
Sept. 30, 2020 Sept. 29, 2024 Active
8 Probabilistic Tomography of Wireless Networks EPSRC
£2,077,080
June 30, 2020 Dec. 31, 2023 Active
9 Enabling rising penetration and added value of photovoltaic generation by implementationPV system integration of advanced storage systems Innovate UK
£130,434
Dec. 1, 2018 Oct. 30, 2021 Closed
10 Enabling rising penetration and added value of photovoltaic generation by implementationPV system integration of advanced storage systems Innovate UK
£326,085
Dec. 1, 2018 Oct. 31, 2021 Closed
11 Investigation of Planar Transmission Lines on Liquid Crystal Substrates at mm-Wave Frequencies EPSRC
£751,832
June 30, 2007 Dec. 31, 2010 Closed
12 Investigation of Planar Transmission Lines on Liquid Crystal Substrates at mm-Wave Frequencies EPSRC
£878,348
June 30, 2007 Dec. 31, 2010 Closed
13 High Frequency Applications of Memristors EPSRC
£0
Sept. 30, 2020 March 31, 2024 Active
14 High Frequency Applications of Memristors EPSRC
£0
Sept. 30, 2020 March 31, 2024 Active
15 Design of novel, additively manufactured cellular lattice supported composite structures using topology optimisation EPSRC
£0
Sept. 30, 2019 Jan. 31, 2024 Active
16 Investigating the effect of blade topology on the performance of small-scale cryogenic turbines manufactured using various 3D printing materials EPSRC
£0
Sept. 15, 2019 March 15, 2023 Active
17 Investigating the effect of blade topology on the performance of small-scale cryogenic turbines manufactured using various 3D printing materials EPSRC
£0
Sept. 15, 2019 March 15, 2023 Closed
18 Integrated Refrigeration System for Gas Conditioning and Heat Manamgement in Hydrogen Refuelling Stations Innovate UK
£200,000
Dec. 1, 2012 Nov. 30, 2013 Closed
19 Ultra-efficient grid-tie inverter technology EPSRC
£197,588
Aug. 31, 2013 May 30, 2015 Closed
20 Ultra-efficient grid-tie inverter technology EPSRC
£493,970
Aug. 31, 2013 May 31, 2015 Closed
Reset