Home Projects More like: Seismic response of monopiles in liquefiable soils [Clear] # Title Funder Funding Start End Status 41 STRUCTURAL LIFE-CYCLE ENHANCEMENT OF NEXT-GENERATION ONSHORE AND OFFSHORE WIND FARMS EPSRC £457,655 June 3, 2023 May 31, 2024 Active 42 STRUCTURAL LIFE-CYCLE ENHANCEMENT OF NEXT-GENERATION ONSHORE AND OFFSHORE WIND FARMS EPSRC £1,104,735 Aug. 31, 2021 June 3, 2023 Closed 43 Mooring analysis and design for offshore WEC survivability and fatigue (MoorWEC) EPSRC £2,026,678 Aug. 31, 2021 Aug. 30, 2024 Active 44 Mooring analysis and design for offshore WEC survivability and fatigue (MoorWEC) EPSRC £5,066,695 Aug. 31, 2021 Aug. 31, 2024 Active 45 Characterisation of hydrodynamic loads on floating Wind Turbine Generator substructures EPSRC £0 Aug. 31, 2020 Aug. 30, 2024 Active 46 Modelling the Impact of Large Floating Wind Turbines on Offshore Navigation and Safety Critical Radar Systems EPSRC £276,434 Feb. 1, 2019 April 29, 2020 Closed 47 Modelling the Impact of Large Floating Wind Turbines on Offshore Navigation and Safety Critical Radar Systems EPSRC £691,085 Feb. 1, 2019 April 30, 2020 Closed 48 FloWTurb: Response of Tidal Energy Converters to Combined Tidal Flow, Waves, and Turbulence EPSRC £1,491,084 April 12, 2016 Oct. 31, 2019 Closed 49 Next generation offshore wind turbine monopile foundation installation drill. Innovate UK £198,956 Nov. 1, 2020 April 29, 2021 Closed 50 Next generation offshore wind turbine monopile foundation installation drill. Innovate UK £497,390 Nov. 1, 2020 April 30, 2021 Closed 51 Advanced Measurement, Modelling and Utilisation of Bouncing and Jumping Loading Induced by Groups and Crowds EPSRC £197,824 Nov. 1, 2013 May 31, 2015 Closed 52 SISProtect - Self Installing Scour Protection for Offshore Wind Farms Innovate UK £3,856,293 Dec. 1, 2018 March 30, 2022 Active 53 Quarter Scale Testing of the Intelligent Mooring System for Floating Offshore Wind Platforms Innovate UK £819,868 April 30, 2021 Feb. 28, 2023 Active 54 Fatigue Effects in Composite Tidal Turbine Blades caused by Discrete Point Loading during Service EPSRC £0 Sept. 30, 2021 Sept. 29, 2025 Active 55 EPSRC-SFI: Wave Breaking in Crossing Seas EPSRC £1,596,850 June 30, 2021 Dec. 31, 2023 Active 56 EPSRC-SFI: Wave Breaking in Crossing Seas EPSRC £3,992,125 June 30, 2021 March 31, 2024 Active 57 Active wind farm control via morphing blade technology EPSRC £0 Sept. 30, 2022 Sept. 29, 2025 Active 58 Active wind farm control via morphing blade technology EPSRC £0 Sept. 30, 2022 Sept. 30, 2025 Active 59 Ecosystem Change, Offshore Wind, Net Gain and Seabirds (ECOWINGS) NERC £106,465 Aug. 8, 2022 Aug. 7, 2026 Active 60 Ecosystem Change, Offshore Wind, Net Gain and Seabirds (ECOWINGS) NERC £23,788 Aug. 8, 2022 Aug. 7, 2026 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »