# Title Funder Funding Start End Status
61 Fracture of Graphite Fuel Bricks EPSRC
£2,067,375
May 31, 2013 Nov. 30, 2015 Closed
62 Modelling aggregate demand-side flexibility in distribution networks with electrified heat and transport EPSRC
£237,921
Sept. 30, 2022 Sept. 29, 2024 Active
63 Modelling aggregate demand-side flexibility in distribution networks with electrified heat and transport EPSRC
£1,189,605
Sept. 30, 2022 Sept. 30, 2024 Active
64 Control of biofouling in water pipes using guided waves EPSRC
£0
Sept. 30, 2020 March 31, 2024 Active
65 Seismic response of monopiles in liquefiable soils EPSRC
£0
Jan. 1, 2021 Jan. 1, 2025 Active
66 Advanced study of the atmospheric flow Integrating REal climate conditions to enhance wind farm and wind turbine power production and increase components durability Horizon Europe Guarantee
£2,475,295
Jan. 1, 2023 Dec. 31, 2026 Active
67 Integrated safety strategies for onboard hydrogen storage systems EPSRC
£1,941,026
Oct. 14, 2013 Oct. 13, 2018 Closed
68 Integrated safety strategies for onboard hydrogen storage systems EPSRC
£4,852,565
Oct. 14, 2013 Oct. 14, 2018 Closed
69 A combined experimental and numerical investigation of premixed flame-wall interaction in turbulent boundary layers EPSRC
£1,553,790
May 23, 2021 May 22, 2025 Active
70 A combined experimental and numerical investigation of premixed flame-wall interaction in turbulent boundary layers EPSRC
£1,285,402
April 5, 2021 April 4, 2025 Active
71 Utilising cycle-accurate architectural simulation to aid in the design space exploration of future HPC hardware. EPSRC
£0
Sept. 30, 2020 March 31, 2024 Active
72 Modelling disorder in magnesium battery cathode materials EPSRC
£0
Sept. 30, 2021 Sept. 29, 2025 Active
73 Submarine mass movements and their interaction with critical offshore infrastructure EPSRC
£659,508
Dec. 1, 2023 May 31, 2025 Active
74 Novel manufacture of solid-state energy storage devices EPSRC
£0
Sept. 30, 2018 July 14, 2022 Active
75 Textured Insulators for Overhead Lines and Substations EPSRC
£925,756
Nov. 19, 2008 April 17, 2012 Closed
76 Textured Insulators for Overhead Lines and Substations EPSRC
£2,314,390
Nov. 19, 2008 April 18, 2012 Closed
77 A combined peridynamics and FE modelling approach to nuclear power plant materials EPSRC
£461,885
Feb. 25, 2013 Aug. 24, 2014 Closed
78 Nonlinear hydrodynamic loadings on Floating Offshore Wind Turbine EPSRC
£0
Sept. 30, 2022 Sept. 29, 2026 Active
79 Aerodynamics of Drones for Offshore Wind Farm Monitoring EPSRC
£0
July 31, 2022 Sept. 29, 2026 Active
80 Aerodynamics of Drones for Offshore Wind Farm Monitoring EPSRC
£0
Sept. 30, 2022 Sept. 30, 2026 Active
Reset