Home Projects More like: Data for Digital Decarbonisation (3D): A FAIR approach to energy demand data in buildings [Clear] # Title Funder Funding Start End Status 61 Turing AI Fellowship: Citizen-Centric AI Systems EPSRC £2,399,962 Jan. 1, 2021 Dec. 31, 2025 Active 62 Energy Management and Analysis Exploiting Existing Building Management Systems Infrastructure and Data EPSRC £1,049,810 Aug. 17, 2014 Feb. 17, 2017 Closed 63 Predicting and mitigating environmental impacts of low head hydropower schemes NERC £100,002 Jan. 21, 2015 June 29, 2016 Closed 64 Predicting and mitigating environmental impacts of low head hydropower schemes NERC £250,005 Jan. 21, 2015 June 30, 2016 Closed 65 PREDICTOR: Improving the energy performance of closed-loop heating and cooling systems. EPSRC £0 Sept. 30, 2020 March 31, 2024 Active 66 PREDICTOR: Improving the energy performance of closed-loop heating and cooling systems. EPSRC £0 Sept. 30, 2020 March 31, 2024 Active 67 Faster model fitting for quantile additive models EPSRC £0 Sept. 30, 2021 Sept. 18, 2025 Active 68 Faster model fitting for quantile additive models EPSRC £0 Sept. 30, 2021 Sept. 19, 2025 Active 69 Developing a Buildings and Energy Data Platform Innovate UK £224,554 June 30, 2018 March 31, 2019 Closed 70 Developing a Buildings and Energy Data Platform ISCF £561,385 June 30, 2018 March 31, 2019 Closed 71 Beyond Individual Persuasion: Towards a Paradigm Shift in Interactive Visualisation and Sensing for Environmental Change EPSRC £3,376,175 Sept. 30, 2021 March 31, 2024 Active 72 Evaluating the potential of coupling the sunlight beam index with lumped parameter modelling in low energy building design EPSRC £0 Sept. 30, 2016 March 30, 2020 Closed 73 Evaluating the potential of coupling the sunlight beam index with lumped parameter modelling in low energy building design EPSRC £0 Sept. 30, 2016 March 31, 2020 Closed 74 DecarboN8 - An integrated network to decarbonise transport EPSRC £2,669,042 Aug. 31, 2019 Aug. 30, 2023 Active 75 DecarboN8 - An integrated network to decarbonise transport EPSRC £6,672,605 Aug. 31, 2019 March 31, 2024 Active 76 Utilising In-Use Data to Reduce Costs, Decarbonise, Verify Build Quality and Ensure Healthy Buildings Innovate UK £107,880 March 31, 2023 June 30, 2023 Closed 77 MaxImiSing flexibility through multi-Scale IntegratiON of energy systems (MISSION) EPSRC £1,257,744 June 28, 2018 May 30, 2022 Closed 78 Low power control methods for energy efficient structures EPSRC £1,025,280 May 31, 2012 Nov. 30, 2015 Closed 79 Building as a Power Plant: The use of buildings to provide demand response EPSRC £334,176 July 31, 2017 March 31, 2019 Closed 80 Building as a Power Plant: The use of buildings to provide demand response EPSRC £835,440 July 31, 2017 March 31, 2019 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »