# Title Funder Funding Start End Status
1 Photoelectrocatalytic CO2 reduction to chemicals and fuels EPSRC
£0
Sept. 30, 2019 Oct. 30, 2023 Active
2 Electrocatalysis in non-thermal plasma for energy storage EPSRC
£255,254
Sept. 30, 2022 Sept. 29, 2024 Active
3 Electrocatalysis in non-thermal plasma for energy storage EPSRC
£1,276,270
Sept. 30, 2022 Sept. 30, 2024 Active
4 CASTECH EPSRC
£17,618,910
Jan. 1, 2009 Dec. 31, 2014 Closed
5 Nano-Integration of Metal-Organic Frameworks and Catalysis for the Uptake and Utilisation of CO2 EPSRC
£2,374,854
April 30, 2010 Feb. 14, 2014 Closed
6 Nano-Integration of Metal-Organic Frameworks and Catalysis for the Uptake and Utilisation of CO2 EPSRC
£5,937,135
April 30, 2010 Feb. 14, 2014 Closed
7 Microwave-assisted upgrading of fast pyrolysis bio-oil using structured zeolites on microwave-absorbing foam supports EPSRC
£397,718
Nov. 1, 2017 Oct. 31, 2019 Closed
8 Microwave-assisted upgrading of fast pyrolysis bio-oil using structured zeolites on microwave-absorbing foam supports EPSRC
£994,295
Nov. 1, 2017 Oct. 31, 2019 Closed
9 Utilising a Naturally Occurring Drag Reduction Method EPSRC
£449,288
June 30, 2021 June 29, 2023 Closed
10 Utilising a Naturally Occurring Drag Reduction Method EPSRC
£120,742
Aug. 31, 2022 June 29, 2023 Active
11 Achieving better chemistry faster through thermoelectric promotion of catalysis Innovate UK
£404,196
Dec. 1, 2017 Nov. 30, 2018 Closed
12 Graphene-Modified Nanoelectrode Sensors for In-Situ Sensing in Regenerative Medicine and Electro-Catalysis EPSRC
£0
Sept. 30, 2020 March 31, 2024 Active
13 Plankton-like protocells for artificial photosynthesis targeting carbon-neutral energy vectors Horizon Europe Guarantee
£2,001,290
March 31, 2023 March 31, 2026 Active
14 Electrocatalytic Cross-Coupling Reactions with Heterogeneous Single Atom Catalysts EPSRC
£613,992
Jan. 1, 2024 Dec. 31, 2024 Active
15 Low-carbon, bio-based alternatives to decorative ceramic tiles Innovate UK
£49,768
Nov. 1, 2022 April 29, 2023 Active
16 Centre for Nature Inspired Engineering (CNIE): Addressing Challenges in Sustainability and Scalable Manufacturing EPSRC
£9,961,546
Nov. 29, 2013 Nov. 28, 2019 Closed
17 EPSRC Centre for Doctoral Training in Critical Resource Catalysis - CRITICAT EPSRC
£8,875,154
April 30, 2014 March 25, 2024 Active
18 EPSRC Centre for Doctoral Training in Critical Resource Catalysis - CRITICAT EPSRC
£22,187,885
April 30, 2014 March 25, 2024 Active
19 Softer Frustrated Lewis Pair Catalysis for Harder Substrates: Stannyl Cations for the Hydrogenation of Carbon Dioxide to Methanol and Methyl Formate EPSRC
£197,442
July 27, 2016 Aug. 27, 2017 Closed
20 Softer Frustrated Lewis Pair Catalysis for Harder Substrates: Stannyl Cations for the Hydrogenation of Carbon Dioxide to Methanol and Methyl Formate EPSRC
£493,605
July 27, 2016 Aug. 28, 2017 Closed
Reset