# Title Funder Funding Start End Status
1 A Safe and Efficient, Low-Cost, High-Pressure Metal Hydride, Hydrogen Storage Solution. Innovate UK
£812,924
Aug. 31, 2022 Aug. 30, 2024 Active
2 A Safe and Efficient, Low-Cost, High-Pressure Metal Hydride, Hydrogen Storage Solution. Innovate UK
£4,064,620
Aug. 31, 2022 Aug. 31, 2024 Active
3 Enabling Electrolyser Manufacturing Capability Innovate UK
£2,478,905
Jan. 1, 2016 Dec. 31, 2017 Closed
4 Frankenstack ISCF
£505,405
June 30, 2018 March 31, 2019 Closed
5 Design of a liquid-piston compressor for raw-wet-biogas to produce biomethane for vehicles and back up power. Innovate UK
£139,292
May 31, 2018 Nov. 30, 2019 Closed
6 Design of a liquid-piston compressor for raw-wet-biogas to produce biomethane for vehicles and back up power. Innovate UK
£348,230
May 31, 2018 Nov. 30, 2019 Closed
7 Novel Process for MEA Catalyst Fixing Innovate UK
£99,814
March 1, 2017 Feb. 28, 2018 Closed
8 Novel Process for MEA Catalyst Fixing Innovate UK
£249,535
March 1, 2017 Feb. 28, 2018 Closed
9 Clean hydrogen production by non-membrane electrolysis Innovate UK
£677,162
March 1, 2020 Aug. 30, 2021 Closed
10 CooltH Engines for Rapid Refuelling of hYdrogen road freight vehicles (Project CHERRY) Innovate UK
£342,830
June 30, 2021 March 30, 2022 Closed
11 CooltH Engines for Rapid Refuelling of hYdrogen road freight vehicles (Project CHERRY) Innovate UK
£857,075
June 30, 2021 March 31, 2022 Closed
12 Improved hydrogen-steam electrodes for solid oxide electrolysers EPSRC
£227,505
Dec. 1, 2022 May 30, 2024 Active
13 DIMENSIONALLY STABLE ELECTRODES FOR SUPERCRITICAL WATER ELECTROLYSIS (SuperH2) EPSRC
£252,097
July 24, 2022 Jan. 24, 2024 Active
14 DIMENSIONALLY STABLE ELECTRODES FOR SUPERCRITICAL WATER ELECTROLYSIS (SuperH2) EPSRC
£1,260,485
July 24, 2022 Jan. 24, 2024 Active
15 Low cost electrochemical coatings for corrosive environments Innovate UK
£154,908
July 31, 2017 July 30, 2018 Closed
16 Low cost electrochemical coatings for corrosive environments ISCF
£387,270
July 31, 2017 July 31, 2018 Closed
17 Nanocoating improvements for Hydrogen Generation Innovate UK
£15,648
Jan. 1, 2022 March 30, 2022 Closed
18 Hydrogen Generation by Electrochemical Water Dissociation EPSRC
£292,402
Sept. 30, 2017 March 31, 2019 Closed
19 Decoupled Electrolysis for the Production of Zero-Carbon Hydrogen EPSRC
£217,826
Nov. 1, 2022 April 29, 2024 Active
20 Decoupled Electrolysis for the Production of Zero-Carbon Hydrogen EPSRC
£1,089,130
Nov. 1, 2022 April 30, 2024 Active
Reset