Home Projects More like: High Throughput Discovery of Hydrogel Nanoclathrates [Clear] # Title Funder Funding Start End Status 1 High Throughput Discovery of Hydrogel Nanoclathrates EPSRC £741,575 March 31, 2008 June 30, 2009 Closed 2 Clathrates for Energy Storage EPSRC £187,564 Nov. 10, 2008 Nov. 9, 2009 Closed 3 Clathrates for Energy Storage EPSRC £468,910 Nov. 10, 2008 Nov. 9, 2009 Closed 4 Towards Zero Carbon Emissions: Novel Low Pressure Molecular Natural Gas/CO2/H2 Storage and Separation using Semi-Clathrates EPSRC £824,642 Jan. 15, 2008 Feb. 14, 2011 Closed 5 A feasibility study to assess the potential of organic crystals as hydrogen storage materials. EPSRC £969,150 Sept. 30, 2007 March 31, 2009 Closed 6 21ENGBIO_pMMO in plants for methane detoxification and as a carbon negative biofuel BBSRC £200,870 Jan. 31, 2022 Jan. 30, 2023 Active 7 21ENGBIO_pMMO in plants for methane detoxification and as a carbon negative biofuel BBSRC £502,175 Jan. 31, 2022 Jan. 30, 2023 Closed 8 Sustainable bioproducts from low cost methane gas BBSRC £0 Sept. 30, 2018 March 30, 2023 Active 9 Sea-level Controls on Quaternary sediment-hosted carbon stores NERC £2,073,390 Aug. 31, 2008 March 31, 2014 Closed 10 GoGREEN: REDUCING THE ENVIRONMENTAL IMPACT OF OPERATING THEATRES - A BEHAVIOURAL SCIENCE APPROACH MRC £100,781 Oct. 13, 2022 Oct. 12, 2023 Active 11 Understanding and reducing artefacts in simultaneously acquired EEG and fMRI data EPSRC £678,358 Feb. 1, 2012 July 30, 2015 Closed 12 Novel constraints on sources and sinks of methane and carbon monoxide from measurements and modelling of radiocarbon NERC £668,260 Dec. 1, 2022 Nov. 30, 2025 Active 13 Novel constraints on sources and sinks of methane and carbon monoxide from measurements and modelling of radiocarbon NERC £3,341,300 Dec. 1, 2022 Nov. 30, 2025 Active 14 Mobile Observations and quantification of Methane Emissions to inform National Targeting, Upscaling and Mitigation (MOMENTUM) NERC £4,135,915 Aug. 31, 2023 Aug. 31, 2026 Active 15 Application of the Renormalisation Group to concrete ageing EPSRC £0 Sept. 30, 2018 May 27, 2022 Active 16 Synthetic Methane: Enabling Renewable Energy Storage by Integrating the Electricity and Gas Networks Innovate UK £52,376 May 31, 2015 Aug. 30, 2015 Closed 17 Synthetic Methane: Enabling Renewable Energy Storage by Integrating the Electricity and Gas Networks Innovate UK £130,940 May 31, 2015 Aug. 31, 2015 Closed 18 Mobile integrated greenhouse gas assessment system (MIGGAS): targetting Net Zero. NERC £546,000 Sept. 30, 2019 Sept. 29, 2020 Closed 19 High Throughput Atom-by-Atom Electrochemistry EPSRC £404,326 April 25, 2021 Dec. 31, 2022 Active 20 Flow Control for a Net Zero World Innovate UK £97,888 Sept. 30, 2020 Dec. 31, 2020 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »