Home Projects More like: YETIS Yes to Energy Through Innovative Sensing [Clear] # Title Funder Funding Start End Status 81 Multi-energy Control of Cyber-Physical Urban Energy Systems (MC2) EPSRC £4,063,715 March 31, 2020 March 31, 2024 Active 82 Development of High Grade Heat Storage for integration with Liquid Air Energy Storage Innovate UK £411,250 March 31, 2018 Sept. 29, 2019 Closed 83 Development of High Grade Heat Storage for integration with Liquid Air Energy Storage Innovate UK £1,028,125 March 31, 2018 Sept. 30, 2019 Closed 84 HubNet: Research Leadership and Networking for Energy Networks (Extension) EPSRC £6,149,625 May 31, 2016 Sept. 29, 2018 Closed 85 HubNet: Research Leadership and Networking for Energy Networks (Extension) EPSRC £10,249,375 May 31, 2016 Sept. 30, 2018 Closed 86 Addressing Energy Poverty in the light of Climate Change in Rural Nepal ESRC £0 Sept. 26, 2021 Sept. 29, 2025 Active 87 Addressing Energy Poverty in the light of Climate Change in Rural Nepal ESRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 88 Renewable Energy Array Cable and Termination Instrumentation using Optical sensor Networks (REACTION) Innovate UK £370,240 Feb. 1, 2019 July 30, 2020 Closed 89 Renewable Energy Array Cable and Termination Instrumentation using Optical sensor Networks (REACTION) Innovate UK £925,600 Feb. 1, 2019 July 31, 2020 Closed 90 Ebbs and Flows of Energy Systems (EFES) EPSRC £690,288 Jan. 1, 2015 Dec. 31, 2017 Closed 91 Ebbs and Flows of Energy Systems (EFES) EPSRC £1,725,720 Jan. 1, 2015 Dec. 31, 2017 Closed 92 Remote, in-service defect monitoring in power generation assets to recover sustainable productivity from Covid-19 Innovate UK £277,712 Sept. 30, 2020 June 29, 2021 Closed 93 Remote, in-service defect monitoring in power generation assets to recover sustainable productivity from Covid-19 Innovate UK £694,280 Sept. 30, 2020 June 30, 2021 Closed 94 Analysis and control of electrical networks dominated by power electronic converters EPSRC £0 Sept. 30, 2019 March 30, 2023 Active 95 Analysis and control of electrical networks dominated by power electronic converters EPSRC £0 Sept. 30, 2019 June 30, 2023 Closed 96 Feasibility Study of Optimisation of Scroll Air Motors and Energy Recovery from Exhaust Compressed Air EPSRC £217,650 Sept. 30, 2007 Dec. 31, 2008 Closed 97 Feasibility Study of Optimisation of Scroll Air Motors and Energy Recovery from Exhaust Compressed Air EPSRC £161,474 Sept. 30, 2007 Dec. 31, 2008 Closed 98 Feasibility Study of Optimisation of Scroll Air Motors and Energy Recovery from Exhaust Compressed Air EPSRC £403,685 Sept. 30, 2007 Dec. 31, 2008 Closed 99 Feasibility Study of Optimisation of Scroll Air Motors and Energy Recovery from Exhaust Compressed Air EPSRC £544,125 Sept. 30, 2007 Dec. 31, 2008 Closed 100 Heat Pump Fully Integrated with Thermochemical Store (HP-FITS) EPSRC £2,594,834 Sept. 30, 2020 Sept. 29, 2024 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »