# Title Funder Funding Start End Status
41 New Phase Field Models for Unravelling Multi-Physics Material Degradation Challenges (NEWPHASE) FLF
£7,366,500
Sept. 30, 2021 Sept. 30, 2025 Active
42 New Phase Field Models for Unravelling Multi-Physics Material Degradation Challenges (NEWPHASE) UKRI
£1,473,300
Sept. 30, 2021 Sept. 29, 2025 Active
43 Performance of structural and fuel materials in molten lead-based fluids EPSRC
£0
Sept. 30, 2021 Sept. 30, 2025 Active
44 Performance of structural and fuel materials in molten lead-based fluids EPSRC
£0
Sept. 19, 2021 Sept. 29, 2025 Active
45 NSF: Healing polymers: A self-assembly approach EPSRC
£693,616
Sept. 30, 2006 March 30, 2010 Closed
46 NSF: Healing polymers: A self-assembly approach EPSRC
£1,734,040
Sept. 30, 2006 March 31, 2010 Closed
47 Modeling and Validation of Irradiation Damage in Ni-based Alloys for Long-Term LWR Applications (US/UK) EPSRC
£2,040,895
Jan. 1, 2016 Dec. 31, 2019 Closed
48 Innovative Forging and Fabrication Solutions for the Nuclear Industry EPSRC
£690,050
May 31, 2015 Dec. 31, 2017 Closed
49 Atomistic studies of dislocation-interface interactions in lamellar Ti-Al EPSRC
£888,838
March 1, 2007 Feb. 28, 2011 Closed
50 Ni-based ODS alloys for Molten Salt Reactors EPSRC
£2,498,640
Dec. 1, 2019 Nov. 30, 2023 Active
51 Structural integrity characterisation of nuclear materials via nano additive manufacturing EPSRC
£1,008,735
March 20, 2017 Sept. 19, 2018 Closed
52 Fatigue Crack Growth in Complex Residual Stress Fields due to Surface Treatment and Foreign Object Damage under Simulated Flight Cycles EPSRC
£555,894
Dec. 3, 2007 June 1, 2011 Closed
53 Fatigue Crack Growth in Complex Residual Stress Fields due to Surface Treatment and Foreign Object Damage under Simulated Flight Cycles EPSRC
£177,708
Sept. 30, 2007 Sept. 29, 2010 Closed
54 Measurement and modelling of electrical, transport and phase-change phenomena and application to Vacuum Arc Remelting for Optimal Material Quality EPSRC
£265,335
Oct. 31, 2006 Oct. 30, 2009 Closed
55 Measurement and modelling of electrical, transport and phase-change phenomena and application to Vacuum Arc Remelting for Optimal Material Quality EPSRC
£508,230
Dec. 21, 2006 Dec. 20, 2009 Closed
56 Measurement and modelling of electrical, transport and phase-change phenomena and application to Vacuum Arc Remelting for Optimal Material Quality EPSRC
£507,561
July 2, 2006 Oct. 1, 2009 Closed
57 Novel high temperature steam transfer pipes EPSRC
£399,708
Sept. 30, 2017 April 29, 2019 Closed
58 Simultaneous Corrosion/Irradiation Testing in Lead and Lead-Bismuth Eutectic: The Radiation Decelerated Corrosion Hypothesis (RC-3) EPSRC
£1,086,628
Jan. 1, 2020 Dec. 31, 2023 Active
59 Simultaneous Corrosion/Irradiation Testing in Lead and Lead-Bismuth Eutectic: The Radiation Decelerated Corrosion Hypothesis (RC-3) EPSRC
£2,716,570
Jan. 1, 2020 Sept. 30, 2024 Active
60 Characterisation and behaviour of advanced Ni-based superalloys at elevated temperatures EPSRC
£0
Sept. 29, 2019 March 28, 2023 Active
Reset