Home Projects More like: CRESS Energy Storage Test Bed Prototype [Clear] # Title Funder Funding Start End Status 1 Digitalisation for operational efficiency and GHG emission reduction at container ports EPSRC £213,025 Feb. 1, 2022 Jan. 31, 2023 Closed 2 Decarbonising the Maritime Supply Chain: Assessing the Contribution of Shippers EPSRC £510,332 May 2, 2010 Aug. 1, 2012 Closed 3 Decarbonising the Maritime Supply Chain: Assessing the Contribution of Shippers EPSRC £1,275,830 May 2, 2010 Aug. 2, 2012 Closed 4 sHYps Sustainable HYdrogen powered Shipping Horizon Europe Guarantee £4,214,425 May 31, 2022 May 31, 2026 Active 5 13TSB_ACT: Lobster Grower - Develop the technology to fast track the aquaculture potential for the European Lobster BBSRC £262,980 May 5, 2014 Nov. 30, 2015 Closed 6 Freeport East Energy Hub Feasibility Study Innovate UK £380,662 Aug. 31, 2021 March 30, 2022 Closed 7 Freeport East Energy Hub Feasibility Study Innovate UK £951,655 Aug. 31, 2021 March 31, 2022 Closed 8 13TSB_ACT: Lobster Grower - Develop the technology to fast track the aquaculture potential for the European Lobster BBSRC £72,094 April 30, 2014 March 30, 2016 Closed 9 Wide-Area Instrumentation of Power Networks using Existing Infrastructure Innovate UK £1,300,616 June 30, 2016 June 29, 2019 Closed 10 Wide-Area Instrumentation of Power Networks using Existing Infrastructure Innovate UK £3,251,540 June 30, 2016 June 30, 2019 Closed 11 MARLIN STAR Community Access to Stored and Transferrable Energy from Floating Renewables Innovate UK £2,533,903 April 30, 2020 April 29, 2022 Closed 12 MARLIN STAR Community Access to Stored and Transferrable Energy from Floating Renewables Innovate UK £4,222,360 April 30, 2020 March 31, 2022 Closed 13 sustainable HYdrogen powered Shipping (sHYpS) Horizon Europe Guarantee £775,950 May 31, 2022 May 31, 2026 Active 14 Port of Aberdeen - Port Zero Project Innovate UK £1,438,595 Jan. 1, 2023 Aug. 31, 2023 Closed 15 Wind Technologies Ltd - Development and testing of a 2 MW medium-speed Brushless DFIG for wind turbines Innovate UK £499,948 Sept. 30, 2012 May 30, 2014 Closed 16 Wind Technologies Ltd - Development and testing of a 2 MW medium-speed Brushless DFIG for wind turbines Innovate UK £1,249,870 Sept. 30, 2012 May 31, 2014 Closed 17 SUPPORTIVE-SUPercapacitors for zero emission PORT-sIde VEhicles Innovate UK £1,297,725 Aug. 31, 2021 March 30, 2022 Active 18 REDUCE: Reshaping Energy Demand of Users by Communication Technology and Economic Incentives (Part 2 of the call) EPSRC £2,295,108 Sept. 30, 2010 Dec. 31, 2013 Closed 19 REDUCE: Reshaping Energy Demand of Users by Communication Technology and Economic Incentives (Part 2 of the call) EPSRC £5,737,770 Sept. 30, 2010 Dec. 31, 2013 Closed 20 Design and validation methods for additively manufactured heat exchangers EPSRC £0 Sept. 29, 2019 Sept. 29, 2023 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »