# Title Funder Funding Start End Status
1 Transitions in everyday practice and Internet intensity EPSRC
£0
Sept. 30, 2016 March 31, 2020 Closed
2 Future Everyday Interaction with the Autonomous Internet of Things EPSRC
£1,612,480
March 31, 2016 Sept. 20, 2016 Closed
3 Future Everyday Interaction with the Autonomous Internet of Things EPSRC
£1,464,740
Dec. 21, 2016 Oct. 31, 2019 Closed
4 Future Everyday Interaction with the Autonomous Internet of Things EPSRC
£4,031,200
March 31, 2016 Sept. 21, 2016 Closed
5 Future Everyday Interaction with the Autonomous Internet of Things EPSRC
£3,661,850
Dec. 21, 2016 Oct. 31, 2019 Closed
6 CharIoT: Leveraging the Internet of Things to Reduce Fuel Poverty EPSRC
£1,385,335
Sept. 30, 2014 March 31, 2016 Closed
7 Beyond Individual Persuasion: Towards a Paradigm Shift in Interactive Visualisation and Sensing for Environmental Change EPSRC
£3,376,175
Sept. 30, 2021 March 31, 2024 Active
8 SANDPIT - Disruption: the raw material for low carbon change EPSRC
£2,227,048
Aug. 31, 2011 July 30, 2015 Closed
9 SANDPIT - Disruption: the raw material for low carbon change EPSRC
£5,567,620
Aug. 31, 2011 July 31, 2015 Closed
10 Sustainable and Inclusive Wireless Innovate UK
£335,500
Sept. 30, 2020 Sept. 29, 2021 Closed
11 1248 Universal IoT Device Manager Innovate UK
£391,590
March 31, 2015 Dec. 31, 2015 Closed
12 Non-linear (large signal) Millimetre-wave Devices, Circuits and Systems On-Wafer Characterization Facility EPSRC
£2,918,304
Jan. 1, 2019 Dec. 31, 2019 Closed
13 Non-linear (large signal) Millimetre-wave Devices, Circuits and Systems On-Wafer Characterization Facility EPSRC
£7,295,760
Jan. 1, 2019 Dec. 31, 2019 Closed
14 (SANDPIT) Sixth Sense Transport (Reducing/re-distributing transport options through a flexible interpretation of time) EPSRC
£1,459,846
July 31, 2011 Sept. 29, 2014 Closed
15 (SANDPIT) Sixth Sense Transport (Reducing/re-distributing transport options through a flexible interpretation of time) EPSRC
£3,649,615
July 31, 2011 Sept. 30, 2014 Closed
16 KCN: Knowledge Centric Networking EPSRC
£4,914,570
Dec. 31, 2014 June 30, 2018 Closed
17 Painting the Town Green: The temporal evolution of low-carbon practices in UK eco-developments EPSRC
£0
Sept. 30, 2016 May 14, 2021 Closed
18 Painting the Town Green: The temporal evolution of low-carbon practices in UK eco-developments EPSRC
£0
Sept. 30, 2016 May 15, 2021 Closed
19 LEEDR: Low Effort Energy Demand Reduction (Part 2 of the Call) EPSRC
£2,795,264
Sept. 30, 2010 Nov. 30, 2014 Closed
20 LEEDR: Low Effort Energy Demand Reduction (Part 2 of the Call) EPSRC
£6,988,160
Sept. 30, 2010 Nov. 30, 2014 Closed
Reset