Home Projects More like: Liquid metal-cooled fast reactor instrumentation technology development - CFD model development and validation [Clear] # Title Funder Funding Start End Status 1 Liquid metal-cooled fast reactor instrumentation technology development - CFD model development and validation EPSRC £1,837,650 Jan. 1, 2020 Dec. 31, 2023 Active 2 Development of versatile liquid metal testing facility for lead-cooled fast reactor technology EPSRC £1,882,080 Jan. 1, 2020 Dec. 31, 2022 Closed 3 Development of cooling strategies and advanced numerical approaches for heat transfer in nuclear fusion reactor components under extreme heat loads EPSRC £0 Sept. 30, 2020 March 31, 2024 Active 4 Development of cooling strategies and advanced numerical approaches for heat transfer in nuclear fusion reactor components under extreme heat loads EPSRC £0 Sept. 30, 2020 March 31, 2024 Active 5 Nuclear Fission Reactor Thermal-Hydraulics (NUFRETH) - UKAEA EPSRC £7,764,780 Sept. 30, 2021 Sept. 29, 2023 Active 6 NUclear Fission REactor Thermal-Hydraulics (NUFRETH) EPSRC £50,784 Sept. 30, 2021 Sept. 29, 2023 Active 7 NUclear Fission REactor Thermal-Hydraulics (NUFRETH) EPSRC £126,960 Sept. 30, 2021 Sept. 30, 2023 Closed 8 Towards comprehensive multiphase flow modelling for nuclear reactor thermal hydraulics EPSRC £690,850 Aug. 31, 2019 Nov. 28, 2021 Closed 9 Towards comprehensive multiphase flow modelling for nuclear reactor thermal hydraulics EPSRC £98,218 Nov. 29, 2021 May 30, 2023 Active 10 Towards comprehensive multiphase flow modelling for nuclear reactor thermal hydraulics EPSRC £1,727,125 Aug. 31, 2019 Nov. 28, 2021 Closed 11 Towards comprehensive multiphase flow modelling for nuclear reactor thermal hydraulics EPSRC £491,090 Nov. 29, 2021 Aug. 31, 2023 Closed 12 Reliable computational modelling of boiling for high-void and the critical heat flux EPSRC £1,269,668 Dec. 1, 2023 May 31, 2026 Active 13 Development of condensation models for the application of steam condensation in AGR boilers EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 14 Simultaneous Corrosion/Irradiation Testing in Lead and Lead-Bismuth Eutectic: The Radiation Decelerated Corrosion Hypothesis (RC-3) EPSRC £1,086,628 Jan. 1, 2020 Dec. 31, 2023 Active 15 Simultaneous Corrosion/Irradiation Testing in Lead and Lead-Bismuth Eutectic: The Radiation Decelerated Corrosion Hypothesis (RC-3) EPSRC £2,716,570 Jan. 1, 2020 Sept. 30, 2024 Active 16 Indo - UK: Premature, Oscillation-Induced Critical Heat Flux ("Premature OICHF") EPSRC £563,645 Dec. 1, 2015 Nov. 30, 2018 Closed 17 Ni-based ODS alloys for Molten Salt Reactors EPSRC £2,498,640 Dec. 1, 2019 Nov. 30, 2023 Active 18 Modelling surface effects in two-phase fluid processes across scales EPSRC £1,969,210 Aug. 31, 2020 Jan. 31, 2022 Closed 19 Modelling surface effects in two-phase fluid processes across scales EPSRC £1,038,280 Feb. 1, 2022 Feb. 29, 2024 Active 20 Deposition-MSFR: a numerical study for the surface plating of noble metals in Molten Salt Fast Reactors STFC £91,610 Jan. 1, 2022 Aug. 30, 2022 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »