Home Projects More like: STRATA; Layers for Structuring Trustworthy Ambient Systems [Clear] # Title Funder Funding Start End Status 1 STRATA; Layers for Structuring Trustworthy Ambient Systems EPSRC £4,826,490 May 31, 2016 May 31, 2021 Closed 2 Robust Formal Verification and Synthesis of Cyber-Physical Systems EPSRC £0 Jan. 10, 2022 July 8, 2025 Active 3 Plug and play fault-tolerant control EPSRC £0 Sept. 30, 2016 March 30, 2020 Closed 4 Plug and play fault-tolerant control EPSRC £0 Sept. 30, 2016 March 31, 2020 Closed 5 Fault tolerant control for increased safety and security of nuclear power plants EPSRC £878,499 Dec. 1, 2018 Feb. 28, 2022 Closed 6 Fault tolerant control for increased safety and security of nuclear power plants EPSRC £472,296 Sept. 30, 2018 Aug. 30, 2023 Active 7 Fault tolerant control for increased safety and security of nuclear power plants EPSRC £1,464,165 Dec. 1, 2018 Feb. 28, 2022 Closed 8 Superconducting fault current limiter to enable grid integration of wind power EPSRC £564,026 Jan. 1, 2014 April 29, 2017 Closed 9 Superconducting fault current limiter to enable grid integration of wind power EPSRC £1,410,065 Jan. 1, 2014 April 30, 2017 Closed 10 Energy Efficient Control EPSRC £858,214 Aug. 31, 2015 July 31, 2019 Closed 11 Novel Asynchronous Algorithms and Software for Large Sparse Systems EPSRC £642,202 Sept. 30, 2010 March 30, 2014 Closed 12 Novel Asynchronous Algorithms and Software for Large Sparse Systems EPSRC £1,605,505 Sept. 30, 2010 March 31, 2014 Closed 13 Realistic fault modelling to enable optimization of low power IoT and Cognitive fault-tolerant computing systems EPSRC £892,480 Jan. 1, 2021 Dec. 31, 2023 Active 14 Power Density Optimisation of a Linear Electrical Drive EPSRC £0 Sept. 30, 2019 Oct. 14, 2023 Closed 15 Border Patrol: Improving Smart Device Security through Type-Aware Systems Design EPSRC £8,828,795 Feb. 1, 2017 July 31, 2023 Closed 16 Energy Management and Analysis Exploiting Existing Building Management Systems Infrastructure and Data EPSRC £1,049,810 Aug. 17, 2014 Feb. 17, 2017 Closed 17 Mitigating the effect of low inertia and low short-circuit level in HVDC-rich AC grids EPSRC £591,264 Dec. 15, 2014 April 29, 2018 Closed 18 Mitigating the effect of low inertia and low short-circuit level in HVDC-rich AC grids EPSRC £1,478,160 Dec. 15, 2014 April 30, 2018 Closed 19 Intelligent and Integrated Condition Monitoring of Distributed Generation Systems EPSRC £198,046 Jan. 16, 2012 May 14, 2013 Closed 20 Intelligent and Integrated Condition Monitoring of Distributed Generation Systems EPSRC £495,115 Jan. 16, 2012 May 15, 2013 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 »