Home Projects More like: GRAVITRICITY energy storage: Subsystem Testing and Detailed Design for cost reduction [Clear] # Title Funder Funding Start End Status 41 Efficient bi directional DC PSU/Inverters for low power distributed energy systems and DC load/supplies Innovate UK £652,430 Aug. 31, 2013 Nov. 30, 2014 Closed 42 Energy Superhub Oxford: Unlocking scalable solutions for EV charging, battery storage and heat through transmission connection and machine learning Innovate UK £22,729,890 March 31, 2019 March 30, 2023 Active 43 Grid Scale Thermal and Thermo-Chemical Electricity Storage EPSRC £1,070,287 Sept. 30, 2022 Sept. 29, 2024 Active 44 Grid Scale Thermal and Thermo-Chemical Electricity Storage EPSRC £5,351,435 Sept. 30, 2022 March 30, 2025 Active 45 Redox Flow Battery Materials for Energy Storage EPSRC £0 Sept. 30, 2019 March 30, 2023 Active 46 Redox Flow Battery Materials for Energy Storage EPSRC £0 Sept. 30, 2019 March 31, 2023 Closed 47 Heat as a Service (HaaS) using Warmstone Zero Carbon Boiler (ZCB) Innovate UK £101,404 Nov. 1, 2020 Jan. 31, 2021 Closed 48 Heat as a Service (HaaS) using Warmstone Zero Carbon Boiler (ZCB) Innovate UK £253,510 Nov. 1, 2020 Jan. 31, 2021 Closed 49 Faraday Exchanger for Renewable Generation Integration (FERGI) Innovate UK £1,539,634 March 1, 2019 Feb. 28, 2021 Closed 50 Faraday Exchanger for Renewable Generation Integration (FERGI) Innovate UK £3,849,085 March 1, 2019 Feb. 28, 2021 Closed 51 IMPULSE - Advanced Industrial Manufacture of Next-Generation MARBN Steel for Cleaner Fossil Plant EPSRC £342,860 Feb. 1, 2016 Dec. 31, 2019 Closed 52 Novel lithium battery management and monitoring system for automotive Innovate UK £434,980 Feb. 1, 2018 April 29, 2019 Closed 53 Hi-CAES: High Performance Compressed Air Energy Storage Elevated through High-Temperature Thermal Storage EPSRC £1,076,648 Aug. 31, 2022 Aug. 30, 2024 Active 54 Hi-CAES: High Performance Compressed Air Energy Storage Elevated through High-Temperature Thermal Storage EPSRC £5,383,240 Aug. 31, 2022 Aug. 31, 2024 Active 55 ISCF Wave 1: 3D electrodes from 2D materials EPSRC £1,847,952 Sept. 30, 2017 March 30, 2021 Closed 56 ISCF Wave 1: 3D electrodes from 2D materials UUI £4,619,880 Sept. 30, 2017 March 31, 2021 Closed 57 Project Centurion Feasibility Study Innovate UK £445,595 Sept. 30, 2018 March 30, 2020 Closed 58 Project Centurion Feasibility Study Innovate UK £1,115,550 Sept. 30, 2018 March 31, 2020 Closed 59 SCORRES: Smart Control of Rural Renewable Energy & Storage EPSRC £199,834 March 31, 2017 March 30, 2018 Closed 60 SCORRES: Smart Control of Rural Renewable Energy & Storage EPSRC £499,585 March 31, 2017 March 31, 2018 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »