Home Projects More like: Investigation into an ultra-high efficiency liquid-piston compressor [Clear] # Title Funder Funding Start End Status 1 Investigation into an ultra-high efficiency liquid-piston compressor EPSRC £0 Sept. 30, 2018 April 5, 2024 Active 2 Two -Phase Polytropic Energy Storage EPSRC £231,472 April 30, 2015 April 29, 2016 Closed 3 Two -Phase Polytropic Energy Storage EPSRC £578,680 April 30, 2015 April 30, 2016 Closed 4 Pumped Thermal Electricity Storage EPSRC £784,414 Sept. 23, 2012 Sept. 22, 2016 Closed 5 Pumped Thermal Electricity Storage EPSRC £636,650 May 31, 2012 July 30, 2016 Closed 6 Pumped Thermal Electricity Storage EPSRC £227,070 May 23, 2012 May 22, 2016 Closed 7 Pumped Thermal Electricity Storage EPSRC £1,591,625 May 31, 2012 July 31, 2016 Closed 8 Isothermal Compression and Generation Technology for Clean Energy, Storage & E-Mobility Innovate UK £392,111 Sept. 30, 2022 March 31, 2024 Active 9 Isothermal Compression and Generation Technology for Clean Energy, Storage & E-Mobility Innovate UK £1,960,555 Sept. 30, 2022 March 31, 2024 Active 10 A Revolutionary Rotary Ericsson Heat Pump/Engine EPSRC £197,340 Sept. 30, 2016 Sept. 29, 2017 Closed 11 A Revolutionary Rotary Ericsson Heat Pump/Engine EPSRC £493,350 Sept. 30, 2016 Sept. 30, 2017 Closed 12 Gravitricity Ltd, Development of Hybrid Mechanical and Compressed Air Energy Storage System Innovate UK £258,204 Sept. 30, 2016 Aug. 30, 2017 Closed 13 Gravitricity Ltd, Development of Hybrid Mechanical and Compressed Air Energy Storage System Innovate UK £645,510 Sept. 30, 2016 Aug. 31, 2017 Closed 14 Grid Scale Thermal and Thermo-Chemical Electricity Storage EPSRC £1,070,287 Sept. 30, 2022 Sept. 29, 2024 Active 15 Grid Scale Thermal and Thermo-Chemical Electricity Storage EPSRC £5,351,435 Sept. 30, 2022 March 30, 2025 Active 16 Integrated Refrigeration System for Gas Conditioning and Heat Manamgement in Hydrogen Refuelling Stations Innovate UK £200,000 Dec. 1, 2012 Nov. 30, 2013 Closed 17 GRAVITRICITY energy storage: Subsystem Testing and Detailed Design for cost reduction Innovate UK £1,278,652 Dec. 1, 2018 April 29, 2021 Closed 18 Energy harvesting to reduce the carbon footprint of the gas distribution network Innovate UK £119,890 Sept. 30, 2020 Dec. 31, 2020 Closed 19 Energy harvesting to reduce the carbon footprint of the gas distribution network Innovate UK £299,725 Sept. 30, 2020 Dec. 31, 2020 Closed 20 Low Temperature Waste Heat to Power Generation EPSRC £645,458 June 30, 2016 Dec. 31, 2019 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »