Home Projects More like: Graphene enabled next generation battery technology [Clear] # Title Funder Funding Start End Status 81 Crossing Boundaries in Energy Storage EPSRC £15,196,080 July 31, 2011 Dec. 31, 2013 Closed 82 ISCF Wave 1: High Energy Density Capacitors Manufactured with Optoelectronic Tweezers (CapOET) EPSRC £1,917,890 Sept. 30, 2017 March 30, 2021 Closed 83 ISCF Wave 1: High Energy Density Capacitors Manufactured with Optoelectronic Tweezers (CapOET) UUI £4,794,725 Sept. 30, 2017 March 31, 2021 Closed 84 SUPERGEN - The Energy Storage Consortium: CORE Proposal EPSRC £6,809,744 Feb. 15, 2010 Aug. 13, 2014 Closed 85 SUPERGEN - The Energy Storage Consortium: CORE Proposal EPSRC £17,024,360 Feb. 15, 2010 Aug. 14, 2014 Closed 86 Microgrid Energy Storage using Lithum-Sulfur Batteries EPSRC £195,180 Sept. 30, 2016 Sept. 29, 2017 Closed 87 Microgrid Energy Storage using Lithum-Sulfur Batteries EPSRC £487,950 Sept. 30, 2016 Sept. 30, 2017 Closed 88 Platform Grant Renewal - Materials for Lithium Batteries EPSRC £2,255,830 Aug. 31, 2011 Dec. 31, 2013 Closed 89 Understanding reaction pathways in alkali metal-air batteries for high energy storage EPSRC £201,290 June 13, 2012 June 12, 2014 Closed 90 Ultra Battery Feasibility - Investigation into the combined battery-supercapacitor for hybrid electric vehicle (HEV) applications EPSRC £695,740 Dec. 1, 2010 May 31, 2012 Closed 91 Temperature and Alkali Stable Polymer Electrolytes for Hydrogen and Carbon Dioxide Alkaline Electrolysers EPSRC £602,472 Dec. 31, 2014 June 29, 2018 Closed 92 Nash equilibria for load balancing in networked power systems EPSRC £994,762 March 31, 2016 May 10, 2019 Closed 93 Nash equilibria for load balancing in networked power systems EPSRC £2,486,905 March 31, 2016 May 11, 2019 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »