# Title Funder Funding Start End Status
81 Low Cost Li-Ion Battery Storage from Recycled Cells for Distributed Power Generation Using Renewable Resources Innovate UK
£139,378
June 30, 2018 March 31, 2019 Closed
82 Low Cost Li-Ion Battery Storage from Recycled Cells for Distributed Power Generation Using Renewable Resources ISCF
£348,445
June 30, 2018 March 31, 2019 Closed
83 SprayCoat Innovate UK
£608,640
March 1, 2018 Feb. 28, 2019 Closed
84 Realistic fault modelling to enable optimization of low power IoT and Cognitive fault-tolerant computing systems EPSRC
£974,398
Jan. 1, 2021 Dec. 31, 2023 Active
85 Realistic fault modelling to enable optimization of low power IoT and Cognitive fault-tolerant computing systems EPSRC
£892,480
Jan. 1, 2021 Dec. 31, 2023 Active
86 RS Fellow - EPSRC grant (2014): Lattice-matched electrode-electrolyte interfaces for high-performance Li-batteries EPSRC
£483,334
Sept. 30, 2015 Sept. 29, 2018 Closed
87 RS Fellow - EPSRC grant (2014): Lattice-matched electrode-electrolyte interfaces for high-performance Li-batteries EPSRC
£1,208,335
Sept. 30, 2015 Sept. 30, 2018 Closed
88 ISCF Wave 1: 3D electrodes from 2D materials EPSRC
£1,847,952
Sept. 30, 2017 March 30, 2021 Closed
89 ISCF Wave 1: 3D electrodes from 2D materials UUI
£4,619,880
Sept. 30, 2017 March 31, 2021 Closed
90 New Sustainable Materials for Rechargeable Batteries & Energy Storage Applications EPSRC
£0
Sept. 30, 2017 Sept. 29, 2021 Closed
91 Low cost storage of renewable energy EPSRC
£262,094
Dec. 16, 2015 Dec. 15, 2018 Closed
92 Low cost storage of renewable energy EPSRC
£655,235
Dec. 16, 2015 Dec. 15, 2018 Closed
93 A new concept for advanced large-scale energy storage: secondary batteries with seawater as open self-replenishing cathode EPSRC
£831,814
Jan. 1, 2016 June 29, 2019 Closed
94 A new concept for advanced large-scale energy storage: secondary batteries with seawater as open self-replenishing cathode EPSRC
£2,079,535
Jan. 1, 2016 June 30, 2019 Closed
95 Design and high throughput microwave synthesis of Li-ion battery materials EPSRC
£733,012
Sept. 30, 2018 Dec. 31, 2021 Closed
96 Design and high throughput microwave synthesis of Li-ion battery materials EPSRC
£2,442,164
Sept. 30, 2015 Sept. 29, 2018 Closed
97 Design and high throughput microwave synthesis of Li-ion battery materials EPSRC
£1,832,530
Sept. 30, 2018 Dec. 31, 2021 Closed
98 Design and high throughput microwave synthesis of Li-ion battery materials EPSRC
£6,105,410
Sept. 30, 2015 Sept. 30, 2018 Closed
99 Zen Energy Optimisation for Electric Car Rental Innovate UK
£117,950
Sept. 30, 2020 Dec. 31, 2020 Closed
100 Zen Energy Optimisation for Electric Car Rental Innovate UK
£294,875
Sept. 30, 2020 Dec. 31, 2020 Closed
Reset