Home Projects More like: Enhancement of Heat-Storage Technology Using Advanced Composite Materials [Clear] # Title Funder Funding Start End Status 41 Electrochemical device for electricity generation using waste water as a fuel Innovate UK £443,720 Feb. 1, 2016 April 30, 2017 Closed 42 High Energy Metal-Based Compounds: The Road to Perazametallocene EPSRC £1,390,898 Sept. 30, 2007 Sept. 29, 2012 Closed 43 Development of a low carbon heating and cooling system with storage and gender based temperature regulation for public and commercial buildings Innovate UK £537,210 Sept. 30, 2020 Sept. 29, 2021 Closed 44 Development of a low carbon heating and cooling system with storage and gender based temperature regulation for public and commercial buildings Innovate UK £1,343,025 Sept. 30, 2020 Sept. 30, 2021 Closed 45 Thermal Conductivity Enhancement of High-Temperature Thermal Energy Stores For Use with Solar Power Plants EPSRC £1,380,120 Sept. 30, 2008 March 30, 2013 Closed 46 Thermal Conductivity Enhancement of High-Temperature Thermal Energy Stores For Use with Solar Power Plants EPSRC £3,450,300 Sept. 30, 2008 March 30, 2013 Closed 47 Phase Change Materials From Molecular To Applications EPSRC £0 Sept. 23, 2018 March 30, 2022 Active 48 Phase Change Materials From Molecular To Applications EPSRC £0 Sept. 30, 2018 March 31, 2022 Closed 49 TGA/FTIR as a Core Equipment for Delivering Research on Energy System Compound Stability EPSRC £199,806 Feb. 12, 2020 Aug. 10, 2021 Closed 50 TGA/FTIR as a Core Equipment for Delivering Research on Energy System Compound Stability EPSRC £499,515 Feb. 12, 2020 Aug. 11, 2021 Closed 51 Sustainable, Affordable and Viable Compressed Air Energy Storage (SAVE-CAES) EPSRC £2,217,092 Aug. 31, 2022 Aug. 30, 2024 Active 52 Sustainable, Affordable and Viable Compressed Air Energy Storage (SAVE-CAES) EPSRC £5,542,730 Aug. 31, 2022 Feb. 28, 2025 Active 53 Reliable computational modelling of boiling for high-void and the critical heat flux EPSRC £1,269,668 Dec. 1, 2023 May 31, 2026 Active 54 Hybrid biomass heating Innovate UK £10,000 Feb. 1, 2014 July 30, 2014 Closed 55 Hybrid biomass heating Innovate UK £25,000 Feb. 1, 2014 July 31, 2014 Closed 56 Experimental Development of a Zero Carbon Boiler to a stage where it can deployed in real homes with beta customers Innovate UK £345,212 Sept. 30, 2020 June 29, 2021 Closed 57 Experimental Development of a Zero Carbon Boiler to a stage where it can deployed in real homes with beta customers Innovate UK £863,030 Sept. 30, 2020 June 30, 2021 Closed 58 An Adsorption-Compression Cold Thermal Energy Storage System (ACCESS) EPSRC £1,022,621 Aug. 31, 2022 Aug. 30, 2024 Active 59 An Adsorption-Compression Cold Thermal Energy Storage System (ACCESS) EPSRC £5,113,105 Jan. 9, 2023 Jan. 8, 2025 Active 60 Investigation of Heat transfer enhancement in Thermal Storage Systems with Phase Change Materials EPSRC £0 Sept. 30, 2019 Dec. 30, 2023 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »