Home Projects More like: Low-cost embedded heterogeneous-component manufacturing process for integrated power electronics [Clear] # Title Funder Funding Start End Status 1 High Frequency Power Conversion Using Wide Band-Gap Semiconductors EPSRC £0 Sept. 30, 2019 Sept. 29, 2023 Active 2 Novel GaN Power Devices and Packaging Technologies for 300 degC Ambient Operation EPSRC £1,146,770 May 31, 2018 Dec. 31, 2021 Closed 3 Novel GaN Power Devices and Packaging Technologies for 300C Ambient Operation EPSRC £660,426 June 30, 2018 Dec. 31, 2021 Closed 4 Novel GaN Power Devices and Packaging Technologies for 300 degC Ambient Operation EPSRC £2,866,925 May 31, 2018 Dec. 31, 2021 Closed 5 Converter Architectures EPSRC £2,518,800 Nov. 1, 2017 Oct. 30, 2021 Closed 6 Converter Architectures EPSRC £6,297,000 Nov. 1, 2017 Oct. 31, 2021 Closed 7 Reliability, Condition Monitoring and Health Management Technologies for WBG Power Modules EPSRC £2,436,242 Sept. 30, 2017 Dec. 31, 2021 Closed 8 Reliability, Condition Monitoring and Health Management Technologies for WBG Power Modules EPSRC £6,090,605 Sept. 30, 2017 Dec. 31, 2021 Closed 9 Towards Solution Processable Single-Molecule Devices: Controlled Assembly of Carbon Nanotube Electrodes for Molecular Electronics EPSRC £498,520 Sept. 30, 2015 Sept. 30, 2017 Closed 10 Advanced COB and 3D packaging of Lateral High Voltage IGBTs for compact medical applications - CoLPACK Innovate UK £109,186 Sept. 30, 2014 Aug. 30, 2015 Closed 11 Underpinning Power Electronics 2017: Heterogeneous Integration EPSRC £2,709,924 Nov. 1, 2017 April 28, 2022 Closed 12 Underpinning Power Electronics 2017: Heterogeneous Integration EPSRC £6,774,810 Nov. 1, 2017 April 29, 2022 Closed 13 Evaluation of beta-Ga2O3 for high power RF device applications EPSRC £509,498 Sept. 30, 2019 March 30, 2021 Closed 14 DC Networks with DC/DC Converters for Integration of Large Renewable Sources EPSRC £1,469,570 May 30, 2013 Dec. 16, 2016 Closed 15 DC Networks with DC/DC Converters for Integration of Large Renewable Sources EPSRC £3,673,925 May 30, 2013 Dec. 16, 2016 Closed 16 FAST-LAPS- Fast LAser Precision Sintering Innovate UK £261,316 July 31, 2014 Sept. 29, 2016 Closed 17 FAST-LAPS- Fast LAser Precision Sintering Innovate UK £653,290 July 31, 2014 Sept. 30, 2016 Closed 18 System-level Co-design and Control of Large Capacity Wave Energy Converters with Multiple PTOs EPSRC £1,568,907 Nov. 1, 2021 Oct. 31, 2024 Active 19 System-level Co-design and Control of Large Capacity Wave Energy Converters with Multiple PTOs EPSRC £691,414 Oct. 3, 2021 Oct. 2, 2024 Active 20 System-level Co-design and Control of Large Capacity Wave Energy Converters with Multiple PTOs EPSRC £266,638 Aug. 31, 2021 Aug. 30, 2024 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »