Home Projects More like: Energy Efficient Control [Clear] # Title Funder Funding Start End Status 21 Flexible and Efficient Power Plant: Flex-E-Plant EPSRC £9,985,000 July 31, 2013 Feb. 28, 2018 Closed 22 Liquid metal-cooled fast reactor instrumentation technology development - CFD model development and validation EPSRC £735,060 Jan. 1, 2020 Dec. 31, 2023 Active 23 Liquid metal-cooled fast reactor instrumentation technology development - CFD model development and validation EPSRC £1,837,650 Jan. 1, 2020 Dec. 31, 2023 Active 24 Characterising electromagnetic fields of integrated electronic systems in enclosures - a ray-wave approach EPSRC £1,165,950 Aug. 31, 2013 Aug. 30, 2016 Closed 25 Nash equilibria for load balancing in networked power systems EPSRC £994,762 March 31, 2016 May 10, 2019 Closed 26 Nash equilibria for load balancing in networked power systems EPSRC £2,486,905 March 31, 2016 May 11, 2019 Closed 27 Maximising Efficiency of Resource Usage Under Uncertainty in AI Planning EPSRC £207,010 Nov. 1, 2011 April 29, 2013 Closed 28 Maximising Efficiency of Resource Usage Under Uncertainty in AI Planning EPSRC £407,490 April 19, 2010 Nov. 1, 2011 Closed 29 Maximising Efficiency of Resource Usage Under Uncertainty in AI Planning EPSRC £517,525 Nov. 1, 2011 April 30, 2013 Closed 30 Maximising Efficiency of Resource Usage Under Uncertainty in AI Planning EPSRC £1,018,725 April 19, 2010 Nov. 1, 2011 Closed 31 Engineering Nonlinearity EPSRC £7,537,866 Dec. 6, 2013 Sept. 5, 2017 Closed 32 Engineering Nonlinearity EPSRC £8,428,172 Sept. 6, 2012 Sept. 5, 2013 Closed 33 Engineering Nonlinearity EPSRC £18,844,665 Dec. 6, 2013 Sept. 6, 2017 Closed 34 Engineering Nonlinearity EPSRC £21,070,430 Sept. 6, 2012 Sept. 6, 2013 Closed 35 Optimisation of WBG power converters to reduce EMI EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 36 Pulse quietening at source for higher-frequency power and signal switching EPSRC £1,603,372 June 16, 2013 June 15, 2018 Closed 37 Converter Architectures EPSRC £2,518,800 Nov. 1, 2017 Oct. 30, 2021 Closed 38 Converter Architectures EPSRC £6,297,000 Nov. 1, 2017 Oct. 31, 2021 Closed 39 Border Patrol: Improving Smart Device Security through Type-Aware Systems Design EPSRC £8,828,795 Feb. 1, 2017 July 31, 2023 Closed 40 Equipment to Underpin Internationally Leading Research at the University of Bristol EPSRC £2,208,000 March 31, 2015 March 30, 2016 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 »