# Title Funder Funding Start End Status
1 Neuromuscular factors influencing foot injury mechanics EPSRC
£0
Sept. 30, 2019 Oct. 31, 2023 Active
2 The effect of changes in tendon stiffness on muscular force production and neuro-motor control during childhood EPSRC
£365,722
June 30, 2007 Sept. 29, 2010 Closed
3 Heterogeneous case-carburised bearing steel microstructures EPSRC
£0
Sept. 30, 2021 Sept. 29, 2025 Active
4 Environmental degradation of SiC/SiC EPSRC
£0
June 30, 2017 June 29, 2020 Closed
5 Management of Fatigue, Safety Challenges Encountered by Technicians and Engineers and enhancing their performance at Offshore Wind Farms. EPSRC
£0
Sept. 30, 2021 March 30, 2025 Active
6 Management of Fatigue, Safety Challenges Encountered by Technicians and Engineers and enhancing their performance at Offshore Wind Farms. EPSRC
£0
Sept. 30, 2021 Jan. 31, 2026 Active
7 Dwell fatigue crack growth in next generation RR1073 nickel disc alloys EPSRC
£0
Sept. 30, 2016 Sept. 29, 2020 Closed
8 A direct method for solving matrix Wiener-Hopf equations EPSRC
£443,695
Aug. 2, 2021 Jan. 21, 2023 Closed
9 Fatigue and damage tolerance of 3D-woven composites EPSRC
£0
Sept. 30, 2021 Sept. 30, 2025 Active
10 The Effects of Local Texture and Microstructure on Deformation Mechanism in IN 713C Alloy EPSRC
£196,952
March 24, 2014 Sept. 22, 2015 Closed
11 The Effects of Local Texture and Microstructure on Deformation Mechanism in IN 713C Alloy EPSRC
£492,380
March 24, 2014 Sept. 23, 2015 Closed
12 COMPLIANT INTERACTIONS AND LIMB MECHANICS DURING ARBOREAL LOCOMOTION IN TROPICAL FOREST ENVIRONMENTS NERC
£207,854
Sept. 30, 2008 March 30, 2012 Closed
13 COMPLIANT INTERACTIONS AND LIMB MECHANICS DURING ARBOREAL LOCOMOTION IN TROPICAL FOREST ENVIRONMENTS NERC
£658,024
Aug. 31, 2008 March 30, 2012 Closed
14 COMPLIANT INTERACTIONS AND LIMB MECHANICS DURING ARBOREAL LOCOMOTION IN TROPICAL FOREST ENVIRONMENTS NERC
£106,132
Sept. 7, 2008 Sept. 6, 2011 Closed
15 Environmentally induced damage propagation with localised stresses in CMCs EPSRC
£0
Sept. 30, 2018 Sept. 29, 2022 Active
16 Unveiling novel functions of peroxisomal lipid-binding proteins in interorganellar cooperation and regulation of lipid metabolism BBSRC
£845,412
Sept. 30, 2016 Dec. 3, 2019 Closed
17 Unveiling novel functions of peroxisomal lipid-binding proteins in interorganellar cooperation and regulation of lipid metabolism BBSRC
£2,113,530
Sept. 30, 2016 Dec. 3, 2019 Closed
18 Next Generation Electro-Chemo-Mechanical Models for Hydrogen Embrittlement (NEXTGEM) EPSRC
£915,664
Sept. 30, 2021 Sept. 29, 2024 Active
19 Next Generation Electro-Chemo-Mechanical Models for Hydrogen Embrittlement (NEXTGEM) EPSRC
£2,289,160
Sept. 30, 2021 Sept. 30, 2024 Active
20 Minerals for encapsulation of high-level nuclear waste: simulating damage and durability NERC
£996,560
Feb. 1, 2006 July 31, 2009 Closed
Reset