Home Projects More like: Modulating tendon micromechanics for injury prevention or management [Clear] # Title Funder Funding Start End Status 1 Neuromuscular factors influencing foot injury mechanics EPSRC £0 Sept. 30, 2019 Oct. 31, 2023 Active 2 The effect of changes in tendon stiffness on muscular force production and neuro-motor control during childhood EPSRC £365,722 June 30, 2007 Sept. 29, 2010 Closed 3 Heterogeneous case-carburised bearing steel microstructures EPSRC £0 Sept. 30, 2021 Sept. 29, 2025 Active 4 Environmental degradation of SiC/SiC EPSRC £0 June 30, 2017 June 29, 2020 Closed 5 Management of Fatigue, Safety Challenges Encountered by Technicians and Engineers and enhancing their performance at Offshore Wind Farms. EPSRC £0 Sept. 30, 2021 March 30, 2025 Active 6 Management of Fatigue, Safety Challenges Encountered by Technicians and Engineers and enhancing their performance at Offshore Wind Farms. EPSRC £0 Sept. 30, 2021 Jan. 31, 2026 Active 7 Dwell fatigue crack growth in next generation RR1073 nickel disc alloys EPSRC £0 Sept. 30, 2016 Sept. 29, 2020 Closed 8 A direct method for solving matrix Wiener-Hopf equations EPSRC £443,695 Aug. 2, 2021 Jan. 21, 2023 Closed 9 Fatigue and damage tolerance of 3D-woven composites EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 10 The Effects of Local Texture and Microstructure on Deformation Mechanism in IN 713C Alloy EPSRC £196,952 March 24, 2014 Sept. 22, 2015 Closed 11 The Effects of Local Texture and Microstructure on Deformation Mechanism in IN 713C Alloy EPSRC £492,380 March 24, 2014 Sept. 23, 2015 Closed 12 COMPLIANT INTERACTIONS AND LIMB MECHANICS DURING ARBOREAL LOCOMOTION IN TROPICAL FOREST ENVIRONMENTS NERC £207,854 Sept. 30, 2008 March 30, 2012 Closed 13 COMPLIANT INTERACTIONS AND LIMB MECHANICS DURING ARBOREAL LOCOMOTION IN TROPICAL FOREST ENVIRONMENTS NERC £658,024 Aug. 31, 2008 March 30, 2012 Closed 14 COMPLIANT INTERACTIONS AND LIMB MECHANICS DURING ARBOREAL LOCOMOTION IN TROPICAL FOREST ENVIRONMENTS NERC £106,132 Sept. 7, 2008 Sept. 6, 2011 Closed 15 Environmentally induced damage propagation with localised stresses in CMCs EPSRC £0 Sept. 30, 2018 Sept. 29, 2022 Active 16 Unveiling novel functions of peroxisomal lipid-binding proteins in interorganellar cooperation and regulation of lipid metabolism BBSRC £845,412 Sept. 30, 2016 Dec. 3, 2019 Closed 17 Unveiling novel functions of peroxisomal lipid-binding proteins in interorganellar cooperation and regulation of lipid metabolism BBSRC £2,113,530 Sept. 30, 2016 Dec. 3, 2019 Closed 18 Next Generation Electro-Chemo-Mechanical Models for Hydrogen Embrittlement (NEXTGEM) EPSRC £915,664 Sept. 30, 2021 Sept. 29, 2024 Active 19 Next Generation Electro-Chemo-Mechanical Models for Hydrogen Embrittlement (NEXTGEM) EPSRC £2,289,160 Sept. 30, 2021 Sept. 30, 2024 Active 20 Minerals for encapsulation of high-level nuclear waste: simulating damage and durability NERC £996,560 Feb. 1, 2006 July 31, 2009 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »