Home Projects More like: COMPLIANT INTERACTIONS AND LIMB MECHANICS DURING ARBOREAL LOCOMOTION IN TROPICAL FOREST ENVIRONMENTS [Clear] # Title Funder Funding Start End Status 21 Towards net zero: development of AI enabled biological observing NERC £79,875 Nov. 1, 2022 June 29, 2023 Active 22 Training in hIPSC differentiation protocols to generate motor neuron-muscle cultures to replace rat models in study of mitochondria on axon physiology NC3Rs £265,140 Feb. 1, 2017 Jan. 31, 2019 Closed 23 CARBON ISOTOPIC SIGNATURES OF MICROBIAL LIPIDS IN GEOTHERMAL DEPOSITS: ELUCIDATING THERMOPHILIC ECOLOGY NERC £458,840 March 1, 2013 Oct. 31, 2014 Closed 24 Production of key nutritional resources for domesticated honeybees BBSRC £0 Sept. 30, 2019 Sept. 29, 2023 Active 25 Production of key nutritional resources for domesticated honeybees BBSRC £0 Sept. 30, 2019 Sept. 30, 2023 Closed 26 Modelling the human occupancy factor in the design of naturally ventilated buildings EPSRC £0 Dec. 18, 2008 July 17, 2010 Closed 27 Modelling the human occupancy factor in the design of naturally ventilated buildings EPSRC £1,101,870 Jan. 1, 2006 Nov. 30, 2008 Closed 28 Revealing the hidden effects of anthropogenic disturbance on the spatiotemporal dynamics of animal populations NERC £1,213,690 Jan. 3, 2022 June 29, 2025 Active 29 Composite dielectric structures with enhanced lifetimes EPSRC £1,097,162 April 30, 2015 Oct. 31, 2018 Closed 30 Composite Dielectric Structures with Enhanced Lifetimes EPSRC £936,770 April 30, 2015 Oct. 31, 2018 Closed 31 Developing an evolutionary model for metabolic syndrome: understanding energy sparing adaptations in geothermal populations of stickleback BBSRC £3,872,665 March 14, 2022 March 13, 2026 Active 32 Transferable Ecology for a changing world (TREE) NERC £80,596 Nov. 1, 2022 July 30, 2023 Active 33 iDeer: An Integrated Deer Management Platform NERC £512,835 Aug. 11, 2022 April 29, 2025 Active 34 On the Behaviour of Discontinuous Interfaces under Dynamic Loading EPSRC £0 Sept. 30, 2021 Sept. 29, 2025 Active 35 Global carbon cycle feedbacks from massive volcanism NERC £0 Sept. 30, 2020 Sept. 26, 2027 Active 36 Assessing the impacts of the 2010 drought on Amazon zone of transition NERC £105,552 Feb. 21, 2011 Aug. 19, 2012 Closed 37 Hot Dogs: climate change impacts in an endothermic predator NERC £987,690 Nov. 1, 2019 Oct. 31, 2023 Active 38 Co-delivery of food and climate regulation by temperate agroforestry (CALIBRE). NERC £1,210,055 Sept. 30, 2017 Dec. 31, 2019 Closed 39 IMPLICATIONS OF INTRASPECIFIC TRAIT VARIABILITY ACROSS DIFFERENT ENVIRONMENTAL CONDITIONS FOR PROJECTIONS OF MARINE ECOSYSTEM FUTURES NERC £3,014,830 Jan. 1, 2020 April 30, 2024 Active 40 Mechanics of rock discontinuities uner elevated temperatures and pressures EPSRC £0 Sept. 30, 2015 Jan. 31, 2020 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »