# Title Funder Funding Start End Status
1 Electromagnetic characterisation of printed circuit boards EPSRC
£526,710
May 31, 2006 Nov. 30, 2009 Closed
2 High End Computing Consortium for Wave Structure Interaction HEC WSI EPSRC
£1,779,795
Jan. 3, 2023 Jan. 2, 2027 Active
3 CCP-WSI+ Collaborative Computational Project on Wave Structure Interaction + EPSRC
£1,562,555
Sept. 30, 2020 Sept. 30, 2025 Active
4 EPSRC Centre for Doctoral Training in Fluid Dynamics at Leeds EPSRC
£7,882,534
March 31, 2014 July 30, 2023 Active
5 A novel integrated approach to efficiently model viscous effects on wave-structure interaction in extreme sea EPSRC
£500,530
Nov. 30, 2015 Nov. 29, 2017 Closed
6 The underpinning mathematics for a novel wave energy converter: the FlexSlosh WEC EPSRC
£158,872
May 1, 2022 Sept. 29, 2023 Active
7 The underpinning mathematics for a novel wave energy converter: the FlexSlosh WEC EPSRC
£397,180
Sept. 30, 2022 Dec. 31, 2023 Active
8 Platform: Underpinning Technologies for Finite Element Simulation EPSRC
£2,574,718
Nov. 1, 2013 Oct. 31, 2018 Closed
9 Numerical study of complex fluid-structure interaction EPSRC
£0
Sept. 30, 2020 March 31, 2024 Active
10 Numerical study of complex fluid-structure interaction EPSRC
£0
Sept. 30, 2020 March 31, 2024 Active
11 RATE-CONTROLLED CONSTRAINED EQUILIBRIUM: A BASIS FOR EFFECTIVE COUPLING OF COMPREHENSIVE CHEMICAL KINETICS AND CFD EPSRC
£273,928
Sept. 30, 2009 Sept. 30, 2010 Closed
12 RATE-CONTROLLED CONSTRAINED EQUILIBRIUM: A BASIS FOR EFFECTIVE COUPLING OF COMPREHENSIVE CHEMICAL KINETICS AND CFD EPSRC
£184,926
Sept. 30, 2010 Sept. 29, 2012 Closed
13 RATE-CONTROLLED CONSTRAINED EQUILIBRIUM: A BASIS FOR EFFECTIVE COUPLING OF COMPREHENSIVE CHEMICAL KINETICS AND CFD EPSRC
£210,364
Jan. 21, 2010 Jan. 20, 2013 Closed
14 Algorithms for Industrial Demand-Side Management Under Uncertainty EPSRC
£701,084
Aug. 25, 2020 Aug. 24, 2023 Active
15 Algorithms for Industrial Demand-Side Management Under Uncertainty EPSRC
£1,752,710
Aug. 25, 2020 Aug. 25, 2023 Closed
16 Designing actively robust products with Bayesian Optimisation EPSRC
£0
Sept. 26, 2021 Sept. 29, 2025 Active
17 Designing actively robust products with Bayesian Optimisation EPSRC
£0
Oct. 3, 2021 Dec. 30, 2025 Active
18 Support for the UKCP consortium EPSRC
£43,326
Jan. 1, 2013 Dec. 31, 2016 Closed
19 Support for the UKCP consortium EPSRC
£791,648
Jan. 1, 2013 Dec. 31, 2016 Closed
20 Support for the UKCP consortium EPSRC
£32,884
Jan. 1, 2013 Dec. 31, 2016 Closed
Reset