Home Projects More like: Development of a novel computational framework for the simulation of fluid-structure interaction [Clear] # Title Funder Funding Start End Status 1 Electromagnetic characterisation of printed circuit boards EPSRC £526,710 May 31, 2006 Nov. 30, 2009 Closed 2 High End Computing Consortium for Wave Structure Interaction HEC WSI EPSRC £1,779,795 Jan. 3, 2023 Jan. 2, 2027 Active 3 CCP-WSI+ Collaborative Computational Project on Wave Structure Interaction + EPSRC £1,562,555 Sept. 30, 2020 Sept. 30, 2025 Active 4 EPSRC Centre for Doctoral Training in Fluid Dynamics at Leeds EPSRC £7,882,534 March 31, 2014 July 30, 2023 Active 5 A novel integrated approach to efficiently model viscous effects on wave-structure interaction in extreme sea EPSRC £500,530 Nov. 30, 2015 Nov. 29, 2017 Closed 6 The underpinning mathematics for a novel wave energy converter: the FlexSlosh WEC EPSRC £158,872 May 1, 2022 Sept. 29, 2023 Active 7 The underpinning mathematics for a novel wave energy converter: the FlexSlosh WEC EPSRC £397,180 Sept. 30, 2022 Dec. 31, 2023 Active 8 Platform: Underpinning Technologies for Finite Element Simulation EPSRC £2,574,718 Nov. 1, 2013 Oct. 31, 2018 Closed 9 Numerical study of complex fluid-structure interaction EPSRC £0 Sept. 30, 2020 March 31, 2024 Active 10 Numerical study of complex fluid-structure interaction EPSRC £0 Sept. 30, 2020 March 31, 2024 Active 11 RATE-CONTROLLED CONSTRAINED EQUILIBRIUM: A BASIS FOR EFFECTIVE COUPLING OF COMPREHENSIVE CHEMICAL KINETICS AND CFD EPSRC £273,928 Sept. 30, 2009 Sept. 30, 2010 Closed 12 RATE-CONTROLLED CONSTRAINED EQUILIBRIUM: A BASIS FOR EFFECTIVE COUPLING OF COMPREHENSIVE CHEMICAL KINETICS AND CFD EPSRC £184,926 Sept. 30, 2010 Sept. 29, 2012 Closed 13 RATE-CONTROLLED CONSTRAINED EQUILIBRIUM: A BASIS FOR EFFECTIVE COUPLING OF COMPREHENSIVE CHEMICAL KINETICS AND CFD EPSRC £210,364 Jan. 21, 2010 Jan. 20, 2013 Closed 14 Algorithms for Industrial Demand-Side Management Under Uncertainty EPSRC £701,084 Aug. 25, 2020 Aug. 24, 2023 Active 15 Algorithms for Industrial Demand-Side Management Under Uncertainty EPSRC £1,752,710 Aug. 25, 2020 Aug. 25, 2023 Closed 16 Designing actively robust products with Bayesian Optimisation EPSRC £0 Sept. 26, 2021 Sept. 29, 2025 Active 17 Designing actively robust products with Bayesian Optimisation EPSRC £0 Oct. 3, 2021 Dec. 30, 2025 Active 18 Support for the UKCP consortium EPSRC £43,326 Jan. 1, 2013 Dec. 31, 2016 Closed 19 Support for the UKCP consortium EPSRC £791,648 Jan. 1, 2013 Dec. 31, 2016 Closed 20 Support for the UKCP consortium EPSRC £32,884 Jan. 1, 2013 Dec. 31, 2016 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »