Home Projects More like: Hydrogen Electrolyser and Fuel Cell [Clear] # Title Funder Funding Start End Status 21 2-D materials as the next generation membranes in hydrogen generation and low temperature fuel cells. EPSRC £2,448,280 March 1, 2016 Feb. 29, 2020 Closed 22 FUEL CELL TECHNOLOGIES FOR AN AMMONIA ECONOMY EPSRC £2,293,684 March 31, 2015 March 31, 2019 Closed 23 FUEL CELL TECHNOLOGIES FOR AN AMMONIA ECONOMY EPSRC £5,734,210 March 31, 2015 March 31, 2019 Closed 24 Carbamide Power Systems - Urea Fuel Cells for Low Cost Energy EPSRC £142,066 July 31, 2011 June 29, 2012 Closed 25 Carbamide Power Systems - Urea Fuel Cells for Low Cost Energy EPSRC £261,090 May 6, 2010 Sept. 30, 2010 Closed 26 Carbamide Power Systems - Urea Fuel Cells for Low Cost Energy EPSRC £355,165 July 31, 2011 June 30, 2012 Closed 27 Carbamide Power Systems - Urea Fuel Cells for Low Cost Energy EPSRC £652,725 May 6, 2010 Oct. 1, 2010 Closed 28 Three-dimensional laccase electrodes for miniaturised fuel cell power sources EPSRC £859,820 Jan. 15, 2011 Nov. 29, 2013 Closed 29 Three-dimensional laccase electrodes for miniaturised fuel cell power sources EPSRC £1,852,208 June 30, 2008 Jan. 15, 2011 Closed 30 Three-dimensional laccase electrodes for miniaturised fuel cell power sources EPSRC £4,630,520 June 30, 2008 Jan. 15, 2011 Closed 31 Three-dimensional laccase electrodes for miniaturised fuel cell power sources EPSRC £2,149,550 Jan. 15, 2011 Nov. 29, 2013 Closed 32 Next generation anion-exchange membranes (AEM) with covalently-bound antiradical functions for enhanced durability EPSRC £1,063,676 Sept. 23, 2020 March 23, 2024 Active 33 Next generation anion-exchange membranes (AEM) with covalently-bound antiradical functions for enhanced durability EPSRC £900,380 Sept. 30, 2020 March 31, 2024 Active 34 Newton Fund - Renewable energy source based on the recovery, purification and storage of hydrogen from chlor-alkali plants Innovate UK £1,856,050 April 30, 2017 April 30, 2019 Closed 35 Improved hydrogen-steam electrodes for solid oxide electrolysers EPSRC £227,505 Dec. 1, 2022 May 30, 2024 Active 36 BLOG-H (using a Battolyser to produce LOw cost Green Hydrogen) EPSRC £162,381 Sept. 30, 2022 March 31, 2024 Active 37 BLOG-H (using a Battolyser to produce LOw cost Green Hydrogen) EPSRC £88,585 May 31, 2022 Nov. 30, 2023 Active 38 BLOG-H (using a Battolyser to produce LOw cost Green Hydrogen) EPSRC £811,905 Sept. 30, 2022 March 31, 2024 Active 39 New Routes to Large Surface Area Sinters for Rapid Response Electrolysers Innovate UK £183,862 June 30, 2013 June 29, 2014 Closed 40 Hydrogen Generation by Electrochemical Water Dissociation EPSRC £292,402 Sept. 30, 2017 March 31, 2019 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »