21 Scaling overall metal effectiveness from ECAT rig to engine conditions EPSRC
£0
Sept. 30, 2019 Sept. 29, 2023 Active
22 CFD Modelling of the acoustic response of sprays EPSRC
£194,258
Jan. 15, 2016 July 13, 2017 Closed
23 SILOET 2: Project 4 Lightweight Composite Casing Manufacturing Development Innovate UK
£7,000,000
June 30, 2012 Dec. 31, 2014 Closed
24 SILOET 2: Project 3: Lightweight Fan System Design and Operation Innovate UK
£6,599,994
June 30, 2012 Dec. 31, 2015 Closed
25 Performance of Die Coatings Used in Injection Moulding of Ceramic Components EPSRC
£0
Sept. 30, 2019 Sept. 28, 2023 Active
26 Utilising a Naturally Occurring Drag Reduction Method EPSRC
£449,288
June 30, 2021 June 29, 2023 Closed
27 Utilising a Naturally Occurring Drag Reduction Method EPSRC
£120,742
Aug. 31, 2022 June 29, 2023 Active
28 Modelling environmentally assisted cracking in Ni-based superalloys EPSRC
£0
Sept. 30, 2019 March 31, 2024 Active
29 Articulated Splined Couplings for Future Aero Gas-Turbine Engines EPSRC
£0
Sept. 30, 2017 Sept. 29, 2021 Closed
30 An Experimental Study of Unsteady Wake-Induced Boundary Layer Transition in Turbomachinery EPSRC
£400,720
Feb. 16, 2006 Nov. 15, 2009 Closed
31 Automated Visual Inspection Sentencing and Dressing (AVID) Innovate UK
£1,568,108
Dec. 1, 2013 Nov. 30, 2016 Closed
32 Project 11 Core Demonstrator Concept Innovate UK
£23,861,703
Sept. 30, 2013 March 30, 2015 Closed
33 Buoyancy-Induced Flow and Heat Transfer Inside Compressor Rotors EPSRC
£642,114
Jan. 1, 2017 June 29, 2020 Closed
34 Buoyancy-Induced Flow and Heat Transfer inside Compressor Rotors EPSRC
£1,436,530
Jan. 11, 2017 Dec. 31, 2020 Closed
35 SUSSUDIO (System Understanding & Sub-System Utopia through Design Integration & Optimisation) Innovate UK
£19,526,612
June 30, 2017 June 29, 2019 Closed
36 Rolls Royce SILOET II Project 20 Core Demonstrator Detailed Design Innovate UK
£16,632,278
April 30, 2014 Jan. 31, 2015 Closed
37 FANDANGO (FAN Design And iNtegrity, GO) Innovate UK
£33,972,256
June 30, 2019 June 29, 2023 Active
38 SILOET Project 1 - Fan System Innovate UK
£12,299,996
Nov. 1, 2009 Oct. 31, 2013 Closed
39 A Two-shaft Resource for Investigation of Engineering Phenomena in High Performance Transmission Systems Facility Innovate UK
£5,210,026
March 31, 2015 March 31, 2019 Closed
40 Shock-Boundary Layer Interaction Control in Hypersonic Flow using Hybrid Micro-Vortex Generators STFC
£511,950
Feb. 1, 2019 March 1, 2022 Closed