Home Projects More like: Instantaneous versus Progressive Nucleation: Impact on additive design [Clear] # Title Funder Funding Start End Status 1 Instantaneous versus Progressive Nucleation: Impact on additive design EPSRC, NERC £0 Sept. 30, 2017 March 31, 2022 Closed 2 Studies on the influence of novel triglyceride chemistry on fat crystallization BBSRC £0 Jan. 1, 2017 June 29, 2021 Closed 3 Studies on the influence of novel triglyceride chemistry on fat crystallization BBSRC £0 Jan. 1, 2017 June 30, 2021 Closed 4 Advanced Inorganic Functional Materials: Floating Zone Crystal Growth System EPSRC £803,374 April 14, 2017 April 13, 2021 Closed 5 Feasibility Study of High Energy and High Intensity X-ray Generation by Pyroelectric Materials EPSRC £157,828 March 9, 2009 Sept. 7, 2010 Closed 6 Unlocking the pre-nucleation state as a route to materials discovery in MOFs EPSRC £849,522 Jan. 1, 2022 Oct. 31, 2025 Active 7 NextGen Structural Biology under Electrochemical Control: Filling in Missing Intermediates in Metalloenzyme Catalytic Cycles BBSRC £577,544 Jan. 1, 2023 Dec. 31, 2025 Active 8 NextGen Structural Biology under Electrochemical Control: Filling in Missing Intermediates in Metalloenzyme Catalytic Cycles BBSRC £418,416 Jan. 1, 2023 Dec. 31, 2025 Active 9 NextGen Structural Biology under Electrochemical Control: Filling in Missing Intermediates in Metalloenzyme Catalytic Cycles BBSRC £2,887,720 Feb. 1, 2023 Jan. 31, 2026 Active 10 Amorphous and crystalline GaNAs alloys for solar energy conversion devices EPSRC £832,412 Jan. 1, 2011 June 29, 2014 Closed 11 Amorphous and crystalline GaNAs alloys for solar energy conversion devices EPSRC £335,030 Dec. 1, 2010 Sept. 29, 2014 Closed 12 Understanding RF Gel Formation: modelling fundamental nanoscale processes for enhanced materials development EPSRC £0 Sept. 30, 2017 Sept. 29, 2021 Closed 13 Materials World Network: Novel Catalyst Systems for Carbon Nanotube (CNT) Synthesis and their Underlying Mechanisms EPSRC £289,676 Sept. 30, 2010 Aug. 30, 2014 Closed 14 Multi-Dimensional Electron Microscope EPSRC £6,172,608 Nov. 14, 2017 May 12, 2022 Active 15 Multi-Dimensional Electron Microscope EPSRC £15,431,520 Nov. 14, 2017 May 13, 2022 Closed 16 Iron atoms coordinated to Nitrogen within Carbon (Fex-N-C) electrocatalysts for Fuel Cells and Electrolysers EPSRC £0 Sept. 30, 2019 Dec. 15, 2023 Active 17 Exploiting Nanoparticles for Thermal and Light Driven Valorisation of Carbon Dioxide EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 18 Exploiting Nanoparticles for Thermal and Light Driven Valorisation of Carbon Dioxide EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 19 Microanalysis of natural and engineered CO2 mineralisation at CarbFix2 site, Iceland EPSRC £0 Aug. 31, 2020 Feb. 28, 2024 Active 20 Microanalysis of natural and engineered CO2 mineralisation at CarbFix2 site, Iceland EPSRC £0 Aug. 31, 2020 Feb. 28, 2024 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »