Home Projects More like: Fine chemicals from lignocellulosic fermentation residues using heterogeneous catalysis [Clear] # Title Funder Funding Start End Status 81 BBSRC Centre For Sustainable Bioenergy (BSBEC): Programme 4: Lignocellulosic Conversion To Bioethanol (LACE) BBSRC £26,747,250 April 30, 2009 March 31, 2015 Closed 82 Reducing contamination risk and increasing yields in the production of platform sugars from UK MSW BBSRC £424,095 Sept. 18, 2016 Sept. 18, 2017 Closed 83 A hybrid strategy for massive acceleration of directed evolution: meeting the need for high-turnover enzymes in industrial biotechnology. BBSRC £1,498,358 Sept. 2, 2018 Dec. 2, 2022 Closed 84 A hybrid strategy for massive acceleration of directed evolution: meeting the need for high-turnover enzymes in industrial biotechnology. BBSRC £3,745,895 Sept. 2, 2018 Dec. 2, 2022 Closed 85 Sustainable Manufacturing in Multiphase Continuous Reactors: Aerobic Oxidations EPSRC £1,997,068 June 30, 2013 April 29, 2016 Closed 86 Sustainable Manufacturing in Multiphase Continuous Reactors: Aerobic Oxidations EPSRC £4,992,670 June 30, 2013 April 30, 2016 Closed 87 Application of microwaves on the production of liquid biofuels EPSRC £201,984 Aug. 31, 2017 Feb. 29, 2020 Closed 88 Application of microwaves on the production of liquid biofuels EPSRC £504,960 Aug. 31, 2017 Feb. 29, 2020 Closed 89 Transnational approaches to resolving biological bottlenecks in macroalgal biofuel production (SuBBSea) BBSRC £1,683,934 Aug. 3, 2014 Nov. 3, 2017 Closed 90 Transnational approaches to resolving biological bottlenecks in macroalgal biofuel production (SuBBSea) BBSRC £4,209,835 Aug. 3, 2014 Nov. 3, 2017 Closed 91 Mechanistic insights into lytic polysaccharide monooxygenases: an integrated structure/spectroscopy study BBSRC £1,390,846 March 31, 2018 March 30, 2023 Active 92 Mechanistic insights into lytic polysaccharide monooxygenases: an integrated structure/spectroscopy study BBSRC £3,477,115 March 31, 2018 March 31, 2023 Closed Reset Search Term(s): Status: --------- Active Closed Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »