# Title Funder Funding Start End Status
21 Plasma-actuator controlled turbulent jets EPSRC
£193,294
Aug. 31, 2015 Aug. 30, 2017 Closed
22 A New Integrated Approach to Measurements and Modelling of Combustion Generated Particulate Matter EPSRC
£1,155,722
April 30, 2011 Oct. 31, 2015 Closed
23 A New Integrated Approach to Measurements and Modelling of Combustion Generated Particulate Matter EPSRC
£1,082,460
Aug. 31, 2011 Feb. 29, 2016 Closed
24 IMT Physics-based and Data-driven Modelling of pollutant Emissions from Engines EPSRC
£0
June 30, 2021 Dec. 31, 2024 Active
25 Stress jump boundary condition capturing for the lattice Boltzmann simulation methods EPSRC
£164,138
Nov. 3, 2014 May 1, 2017 Closed
26 Multiscale Modelling of the Erosive Impact of Particles EPSRC
£0
July 31, 2019 July 30, 2022 Active
27 Improved prediction of cohesive sediment erosion based on inter-particle forces EPSRC
£480,270
March 31, 2020 Dec. 16, 2022 Active
28 Improved prediction of cohesive sediment erosion based on inter-particle forces EPSRC
£1,200,675
March 31, 2020 Dec. 16, 2022 Closed
29 Photo-catalytic Microbubble reactor for conversion of CO2 to Fuels EPSRC
£200,258
Jan. 23, 2013 March 22, 2014 Closed
30 Photo-catalytic Microbubble reactor for conversion of CO2 to Fuels EPSRC
£500,645
Jan. 23, 2013 March 22, 2014 Closed
31 Innovative method of engineering phase change within a bulk fluid (Energy efficient way of manufacturing ice) EPSRC
£0
Sept. 30, 2015 June 29, 2019 Closed
32 Innovative method of engineering phase change within a bulk fluid (Energy efficient way of manufacturing ice) EPSRC
£0
Sept. 30, 2015 June 30, 2019 Closed
33 Nonlinear water waves driven by the motion of a solid body EPSRC
£1,013,418
Aug. 31, 2010 Aug. 27, 2014 Closed
34 Nonlinear water waves driven by the motion of a solid body EPSRC
£2,533,545
Aug. 31, 2010 Aug. 28, 2014 Closed
35 Strategies for reducing cost of Engineering Optimisation EPSRC
£0
Sept. 30, 2019 March 30, 2023 Active
36 Strategies for reducing cost of Engineering Optimisation EPSRC
£0
Sept. 30, 2019 March 31, 2023 Closed
37 EPSRC Centre for Doctoral Training in Fluid Dynamics at Leeds EPSRC
£7,882,534
March 31, 2014 July 30, 2023 Active
38 Modelling Marine Renewable Energy Devices; Designing for Survivability EPSRC
£5,198,085
June 29, 2012 Dec. 29, 2015 Closed
39 Combustor thermoacoustics for multi-burner low emissions gas turbines (CHAMBER) EPSRC
£1,514,258
Jan. 1, 2017 Dec. 31, 2020 Closed
40 Dispersive Mixing in Multicomponent Multiphase Flow: Numerical and Physical Effects EPSRC
£663,772
Sept. 30, 2008 Sept. 29, 2011 Closed
Reset