# Title Funder Funding Start End Status
1 Performance of structural and fuel materials in molten lead-based fluids EPSRC
£0
Sept. 30, 2021 Sept. 30, 2025 Active
2 Advanced chemistry and corrosion studies under hot water conditions relevant to LWR coolant EPSRC, NERC
£0
Sept. 30, 2018 June 30, 2022 Closed
3 High Temperature Zirconium Alloys for Nuclear Fusion and Generation IV Fission Reactors EPSRC
£1,508,740
Aug. 31, 2020 Feb. 28, 2023 Closed
4 Development of Novel Coolant Chemistry for use in Dynamic Reactor Systems EPSRC
£0
Sept. 30, 2019 Sept. 30, 2023 Closed
5 Atomic-Scale Characterisation of Reactor Pressure Steels EPSRC
£0
Sept. 30, 2018 July 30, 2022 Active
6 Atomic-Scale Characterisation of Reactor Pressure Steels EPSRC
£0
Sept. 30, 2018 March 30, 2022 Active
7 Atomic-Scale Characterisation of Reactor Pressure Steels EPSRC, NERC
£0
Sept. 30, 2018 July 31, 2022 Closed
8 Atomic-Scale Characterisation of Reactor Pressure Steels EPSRC
£0
Sept. 30, 2018 March 31, 2022 Closed
9 Thermal transient effects in fusion front wall/breeder blanket components EPSRC
£0
Sept. 30, 2022 Sept. 29, 2026 Active
10 Thermal transient effects in fusion front wall/breeder blanket components EPSRC
£0
Sept. 30, 2022 Sept. 30, 2026 Active
11 Development of an in-situ characterisation facility for both proton and neutron irradiation EPSRC
£6,481,540
Sept. 30, 2021 March 31, 2024 Active
12 A molten salt community framework for predictive modelling of critical characteristics EPSRC
£2,955,910
June 30, 2023 June 30, 2026 Active
13 Simultaneous Corrosion/Irradiation Testing in Lead and Lead-Bismuth Eutectic: The Radiation Decelerated Corrosion Hypothesis (RC-3) EPSRC
£1,086,628
Jan. 1, 2020 Dec. 31, 2023 Active
14 Simultaneous Corrosion/Irradiation Testing in Lead and Lead-Bismuth Eutectic: The Radiation Decelerated Corrosion Hypothesis (RC-3) EPSRC
£2,716,570
Jan. 1, 2020 Sept. 30, 2024 Active
15 MODELLING DUST FORMATION IN A FUSION DEVICE EPSRC
£0
Sept. 30, 2021 Sept. 30, 2025 Active
16 Intermetallic Dispersion Strengthened 'IDS-Steels' for Generation IV Nuclear EPSRC
£3,144,750
June 30, 2022 June 30, 2025 Active
17 Intermetallic Dispersion Strengthened 'IDS-Steels' for Generation IV Nuclear EPSRC
£628,950
June 30, 2022 June 29, 2025 Active
18 Salt-cooled High-temperature Reactors EPSRC
£0
Sept. 30, 2021 Sept. 30, 2025 Active
19 Bcc-superalloys: Engineering Resilience to Extreme Environments UKRI
£2,444,428
Nov. 1, 2020 Oct. 31, 2024 Active
20 Bcc-superalloys: Engineering Resilience to Extreme Environments FLF
£6,111,070
Nov. 1, 2020 Oct. 31, 2024 Active
Reset