Home Projects More like: Feasibility Study: Developing a biopesticide for Cabbage Stem Flea Beetle [Clear] # Title Funder Funding Start End Status 1 14 ERA-CAPS: Mechanistic Analysis of Quantitative Disease Resistance in Brassica by Associative Transcriptomics BBSRC £57,425 Aug. 31, 2015 March 30, 2017 Closed 2 14 ERA-CAPS: Mechanistic Analysis of Quantitative Disease Resistance in Brassica by Associative Transcriptomics BBSRC £933,032 Aug. 31, 2015 Dec. 31, 2018 Closed 3 14 ERA-CAPS Mechanistic Analysis of Quantitative Disease Resistance in Brassica by Associative Transcriptomics BBSRC £701,366 Nov. 1, 2015 Oct. 31, 2018 Closed 4 14 ERA-CAPS: Mechanistic Analysis of Quantitative Disease Resistance in Brassica by Associative Transcriptomics BBSRC £2,332,580 Aug. 31, 2015 Dec. 31, 2018 Closed 5 EMPOWER EPSRC £419,945 Sept. 5, 2010 Sept. 5, 2012 Closed 6 Maximising and measuring impact from the RATE programme NERC £279,210 Nov. 1, 2018 Sept. 29, 2021 Closed 7 EMPOWER EPSRC £473,480 Aug. 31, 2010 Aug. 31, 2012 Closed 8 Water Energy Food: Vaccinating the Nexus EPSRC £7,907,045 June 30, 2015 May 31, 2019 Closed 9 Establishing potential for the protection of crops against damage by slugs and aphids using transgenic plants expressing orally toxic fusion proteins. BBSRC £0 Sept. 30, 2015 Sept. 29, 2019 Closed 10 Realising the Commercial Potential of the Multi-Physics and Multi-Scale FETCH Technology for Nuclear Safety Applications EPSRC £529,605 Aug. 31, 2010 Aug. 31, 2011 Closed 11 Modelling Creep and Creep-Fatigue Damage for CSEF Power Plant Steels EPSRC £0 Sept. 30, 2019 Sept. 29, 2023 Active 12 Wireless, battery-free sensing of composite structures Innovate UK £498,771 July 31, 2019 Sept. 29, 2022 Active 13 Toward an Industrial Strength Automatic Differentiation Product EPSRC £202,930 Nov. 1, 2012 Jan. 31, 2014 Closed 14 Development and commercialisation of dual resist technologies for fabrication in compound semi-conductors Innovate UK £607,460 Nov. 1, 2020 April 29, 2022 Closed 15 Development and commercialisation of dual resist technologies for fabrication in compound semi-conductors Innovate UK £1,427,845 Nov. 1, 2020 April 30, 2022 Closed 16 The use of probabilistic climate scenarios in building environmental performance simulation EPSRC £1,308,415 Sept. 30, 2008 Dec. 31, 2010 Closed 17 The use of probabilistic climate scenarios in building environmental performance simulation EPSRC £265,985 Sept. 30, 2008 Sept. 30, 2010 Closed 18 Scenarios for the development of smart grids in the UK NERC £998,868 Aug. 31, 2011 Aug. 30, 2013 Closed 19 Scenarios for the development of smart grids in the UK NERC £2,497,170 Aug. 31, 2011 Aug. 31, 2013 Closed 20 GelPonic: Smart hydrogels containing graphene-based sensors for precision control of vertical farms Innovate UK £2,099,948 Aug. 31, 2020 April 29, 2023 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »