# Title Funder Funding Start End Status
1 Optimal control methods with application to aerospace systems EPSRC
£0
Sept. 30, 2019 March 31, 2023 Closed
2 REDUCTION OF ENERGY DEMAND IN PAPER MAKING USING ONLINE OPTIMISATION AND CONTROL EPSRC
£600,358
Aug. 31, 2009 Nov. 30, 2011 Closed
3 REDUCTION OF ENERGY DEMAND IN PAPER MAKING USING ONLINE OPTIMISATION AND CONTROL EPSRC
£303,136
May 31, 2009 Aug. 30, 2011 Closed
4 REDUCTION OF ENERGY DEMAND IN PAPER MAKING USING ONLINE OPTIMISATION AND CONTROL EPSRC
£1,500,895
Aug. 31, 2009 Nov. 30, 2011 Closed
5 R6 Eco-Engine Test Program Innovate UK
£52,139
Dec. 1, 2021 Jan. 31, 2022 Closed
6 SilkE Hybrid Propulsion System Innovate UK
£299,984
Nov. 1, 2020 July 30, 2022 Closed
7 Model Predictive Control for Energy Management in Electric Hybrid Vehicles EPSRC
£0
Sept. 30, 2016 July 31, 2020 Closed
8 Trajectory Control of Very Flexible Aircraft EPSRC
£0
Sept. 30, 2018 March 30, 2022 Active
9 Trajectory Control of Very Flexible Aircraft EPSRC
£0
Sept. 30, 2018 March 31, 2022 Closed
10 3DSensorNode = 3D airborne sensor platform for use in a hostile environment Innovate UK
£48,000
May 31, 2013 Nov. 30, 2013 Closed
11 Real-time Numerical Optimization in Reconfigurable Hardware with Application to Model-Predictive Control EPSRC
£629,748
Aug. 31, 2009 Feb. 28, 2013 Closed
12 Real-time Numerical Optimization in Reconfigurable Hardware with Application to Model-Predictive Control EPSRC
£1,054,552
May 31, 2009 Nov. 30, 2012 Closed
13 HyFly - Hybrid-Electric Flying Demonstrator Innovate UK
£28,035,120
April 30, 2018 Jan. 31, 2023 Closed
14 DEMSIS: Digital energy management services in supermarket buildings via cloud-based solutions EPSRC
£100,434
Dec. 1, 2021 Nov. 30, 2022 Active
15 DEMSIS: Digital energy management services in supermarket buildings via cloud-based solutions EPSRC
£251,085
March 1, 2022 Nov. 30, 2022 Closed
16 Fatigue Crack Growth in Complex Residual Stress Fields due to Surface Treatment and Foreign Object Damage under Simulated Flight Cycles EPSRC
£177,708
Sept. 30, 2007 Sept. 29, 2010 Closed
17 Fatigue Crack Growth in Complex Residual Stress Fields due to Surface Treatment and Foreign Object Damage under Simulated Flight Cycles EPSRC
£555,894
Dec. 3, 2007 June 1, 2011 Closed
18 Unlocking the Potential of Model-Predictive Control in Non-domestic Building Energy Management: Automated Configuration and Optimisation of Control EPSRC
£164,776
July 31, 2016 July 30, 2019 Closed
19 Unlocking the Potential of Model-Predictive Control in Non-domestic Building Energy Management: Automated Configuration and Optimisation of Control EPSRC
£1,081,208
July 31, 2016 April 29, 2020 Closed
20 Unlocking the Potential of Model-Predictive Control in Non-domestic Building Energy Management: Automated Configuration and Optimisation of Control EPSRC
£2,703,020
July 31, 2016 April 30, 2020 Closed
Reset