More like:
Photovoltaic Paint [Clear]

# Title Funder Funding Start End Status
1 Manufacturing solar fabrics by electronic dyeing of textiles with 2D heterostructures EPSRC
£506,084
Aug. 31, 2021 Aug. 30, 2023 Active
2 Manufacturing solar fabrics by electronic dyeing of textiles with 2D heterostructures EPSRC
£1,265,210
Aug. 31, 2021 Aug. 31, 2023 Closed
3 Photovoltaic Technology based on Earth Abundant Materials - PVTEAM EPSRC
£4,025,392
March 1, 2014 June 29, 2018 Closed
4 Photovoltaic Technology based on Earth Abundant Materials - PVTEAM EPSRC
£10,063,480
March 1, 2014 June 30, 2018 Closed
5 On-line surface inspection of roll-to-roll film processing EPSRC
£187,336
April 30, 2013 Oct. 31, 2014 Closed
6 On-line surface inspection of roll-to-roll film processing EPSRC
£468,340
April 30, 2013 Oct. 31, 2014 Closed
7 Application Targeted and Integrated Photovoltaics - Enhancing UK Capability in Solar EPSRC
£11,983,474
June 30, 2020 June 29, 2025 Active
8 Application Targeted and Integrated Photovoltaics - Enhancing UK Capability in Solar EPSRC
£29,958,685
June 30, 2020 June 30, 2025 Active
9 Low-cost printed flexible solar cells as substitute for current (1st and 2nd generation) photovoltaics for building integrated applications in India NERC
£251,962
Sept. 30, 2019 July 30, 2021 Closed
10 Low-cost printed flexible solar cells as substitute for current (1st and 2nd generation) photovoltaics for building integrated applications in India NERC
£629,905
Sept. 30, 2019 July 31, 2021 Closed
11 Graphene Flexible Electronics and Optoelectronics EPSRC
£5,914,572
Feb. 1, 2013 Jan. 31, 2018 Closed
12 Formulating and Manufacturing Low Profile Integrated Batteries for Wireless Sensing Labels EPSRC
£2,579,830
April 30, 2018 April 29, 2022 Closed
13 Structural Composites Research Facility (SCRF) EPSRC
£2,799,560
May 31, 2017 Nov. 30, 2020 Closed
14 Structural Composites Research Facility (SCRF) EPSRC
£6,998,900
May 31, 2017 Nov. 30, 2020 Closed
15 Self-sustained surface cleaning of solar energy systems EPSRC
£0
Sept. 30, 2020 Oct. 10, 2025 Closed
16 THE FUTURE COMPOSITES MANUFACTURING HUB EPSRC
£54,153,955
Jan. 1, 2017 June 30, 2024 Active
17 Energy Resilient Manufacturing 2: Small is Beautiful Phase 2 (SIB2) EPSRC
£3,778,750
Jan. 9, 2017 Jan. 8, 2021 Closed
18 SPECIFIC Tranche 2: Heat, Water, PV and Bio-inspiration EPSRC
£8,134,890
May 31, 2013 May 31, 2016 Closed
19 Engineering Doctoral Centre in High Value, Low Environmental Impact Manufacturing EPSRC
£2,500,000
March 31, 2011 Sept. 29, 2018 Closed
20 Optimisation of charge carrier mobility in nanoporous metal oxide films EPSRC
£1,597,290
Jan. 1, 2017 Oct. 31, 2020 Closed
Reset