Home Projects More like: AIM3: Additive and intelligent manufacturing of multi-functional membranes [Clear] # Title Funder Funding Start End Status 1 Composite membranes for H2 purification EPSRC £0 Sept. 30, 2022 Sept. 29, 2026 Active 2 Nano-Integration of Metal-Organic Frameworks and Catalysis for the Uptake and Utilisation of CO2 EPSRC £2,374,854 April 30, 2010 Feb. 14, 2014 Closed 3 Nano-Integration of Metal-Organic Frameworks and Catalysis for the Uptake and Utilisation of CO2 EPSRC £5,937,135 April 30, 2010 Feb. 14, 2014 Closed 4 In situ structural cell biology - studying bioenergetics at the nanoscope. BBSRC £0 Sept. 30, 2022 Sept. 30, 2026 Active 5 Metal-Organic Frameworks based membranes for gas separation in Li-air batteries EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 6 Metal-Organic Frameworks based membranes for gas separation in Li-air batteries EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 7 New microporous polymers for carbon dioxide selective membranes EPSRC £772,782 March 1, 2013 Dec. 31, 2013 Closed 8 New microporous polymers for carbon dioxide selective membranes EPSRC £1,440,450 Jan. 1, 2014 Feb. 29, 2016 Closed 9 New microporous polymers for carbon dioxide selective membranes EPSRC £1,931,955 March 1, 2013 Dec. 31, 2013 Closed 10 Large-area electronics based on two-dimensional atomically thin materials EPSRC £206,142 June 30, 2013 June 29, 2014 Closed 11 Large-area electronics based on two-dimensional atomically thin materials EPSRC £515,355 June 30, 2013 June 30, 2014 Closed 12 Graphene-based membranes EPSRC £5,678,700 June 30, 2013 June 29, 2018 Closed 13 Isothermal Refining by Organic Solvent Nanofiltration - ISOREF EPSRC £1,473,325 Feb. 1, 2015 Jan. 31, 2017 Closed 14 Bio-methane production from urban organic matter BBSRC £631,906 April 3, 2015 Oct. 31, 2018 Closed 15 Bio-methane production from urban organic matter BBSRC £1,579,765 April 3, 2015 Oct. 31, 2018 Closed 16 RNG Production Cost Reduction due to Methane Enhancement Generation by Microbial Communities Innovate UK £88,720 Nov. 1, 2021 March 30, 2022 Closed 17 Upscaling and Manufacturing of Ion-Selective Membranes for Energy Storage (IonMembrane) Horizon Europe Guarantee £635,205 April 30, 2023 Oct. 31, 2024 Active 18 Biogas production from high volume industrial effluents at ambient temperatures (AmbiGAS) BBSRC £798,210 Aug. 31, 2013 June 29, 2017 Closed 19 Biogas production from high volume industrial effluents at ambient temperatures (AmbiGAS) BBSRC £1,995,525 Aug. 31, 2013 June 30, 2017 Closed 20 Power-to-gas via microbial electrosynthesis of methane from biogenic CO2 Innovate UK £49,998 Nov. 1, 2022 April 29, 2023 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »