# Title Funder Funding Start End Status
81 Environmentally induced damage propagation with localised stresses in CMCs EPSRC
£0
Sept. 30, 2018 Sept. 29, 2022 Active
82 Design of novel, additively manufactured cellular lattice supported composite structures using topology optimisation EPSRC
£0
Sept. 30, 2019 Jan. 31, 2024 Active
83 Structural Composites Research Facility (SCRF) EPSRC
£2,799,560
May 31, 2017 Nov. 30, 2020 Closed
84 Structural Composites Research Facility (SCRF) EPSRC
£6,998,900
May 31, 2017 Nov. 30, 2020 Closed
85 Earthern construction as a tailored alternative to conventional carbon-intensive materials in construction EPSRC
£0
Sept. 30, 2022 Sept. 29, 2026 Active
86 Doped-Up: Bio-Inspired Assembly of Single Crystal Nanocomposites EPSRC
£915,128
Jan. 3, 2017 Jan. 2, 2020 Closed
87 Doped-Up: Bio-Inspired Assembly of Single Crystal Nanocomposites EPSRC
£692,760
Jan. 3, 2017 Jan. 2, 2020 Closed
88 Doped-Up: Bio-Inspired Assembly of Single Crystal Nanocomposites EPSRC
£2,287,820
Jan. 3, 2017 Jan. 2, 2020 Closed
89 Development of novel oxygen ion and electron conducting ceramic cathodes for solid oxide fuel cells EPSRC
£0
Sept. 30, 2017 June 29, 2021 Closed
90 Electrolyte matrix materials for structural battery composites EPSRC
£0
Sept. 29, 2019 Sept. 29, 2023 Active
91 Rapid Inspection of Complex Geometries Using Edge-Guided Ultrasonic Waves EPSRC
£292,314
Aug. 31, 2015 Dec. 1, 2017 Closed
92 Affordable Recycled Carbon Fibres (AFRECAR) Innovate UK
£902,050
Sept. 30, 2008 March 30, 2012 Closed
93 Project 4: Next Generation Fan System Innovate UK
£13,690,080
March 31, 2012 Jan. 31, 2015 Closed
94 Adhesion strength of environmental barrier coatings on SiC/SiC CMCs for aerospace EPSRC
£0
Dec. 1, 2019 July 31, 2023 Active
95 Studies of coatings, lifetime and circular economy of resin-wood composites EPSRC
£0
Sept. 30, 2019 July 30, 2021 Closed
96 Studies of coatings, lifetime and circular economy of resin-wood composites EPSRC
£0
Sept. 30, 2019 July 31, 2021 Closed
97 X-MED: EXtreme Loading of Marine Energy Devices due to Waves, Current, Flotsam and Mammal Impact EPSRC
£1,802,754
Feb. 1, 2012 July 30, 2015 Closed
98 X-MED: EXtreme Loading of Marine Energy Devices due to Waves, Current, Flotsam and Mammal Impact EPSRC
£4,506,885
Feb. 1, 2012 July 31, 2015 Closed
99 Advanced Measurement, Modelling and Utilisation of Bouncing and Jumping Loading Induced by Groups and Crowds EPSRC
£197,824
Nov. 1, 2013 May 31, 2015 Closed
100 PLAT-0 2 - Proving a Low Cost, Composite, Buoyant, Mid-Stream Tidal Turbine Platform at Full-Scale Innovate UK
£2,366,358
Aug. 31, 2014 March 30, 2017 Closed
Reset