Home Projects More like: The HIVE - Resource costs [Clear] # Title Funder Funding Start End Status 21 The development of an early stage thermal model to protect against uncertainty and morbidity in buildings under predicted climate change EPSRC £1,012,114 Aug. 31, 2011 Aug. 30, 2016 Closed 22 Active-LIVing Envelopes (ALIVE) EPSRC £200,552 March 31, 2016 Nov. 30, 2017 Closed 23 Active-LIVing Envelopes (ALIVE) EPSRC £501,380 March 31, 2016 Nov. 30, 2017 Closed 24 Electrochromic Gels for Smart Windows (ChromGels) EPSRC £463,286 Nov. 4, 2019 Aug. 2, 2022 Closed 25 The LCEDN USES Programme Network EPSRC £159,060 Feb. 10, 2014 Feb. 9, 2017 Closed 26 Final Development of a Zero Energy Dehumidification and Cooling System EPSRC £414,170 March 31, 2017 March 31, 2019 Closed 27 The Active Building Centre EPSRC £71,894,854 Sept. 2, 2018 May 6, 2020 Closed 28 The Active Building Centre ISCF £179,737,135 Sept. 2, 2018 May 7, 2020 Closed 29 LIMES.NET: Network for Low Impact Materials and innovative Engineering Solutions for the built environment EPSRC £449,858 Aug. 31, 2011 Sept. 29, 2012 Closed 30 LIMES.NET: Network for Low Impact Materials and innovative Engineering Solutions for the built environment EPSRC £1,124,645 Aug. 31, 2011 Sept. 30, 2012 Closed 31 The 'Total Performance' of Low Carbon Buildings in China and the UK ('TOP') EPSRC £1,594,918 Dec. 1, 2015 May 30, 2019 Closed 32 The 'Total Performance' of Low Carbon Buildings in China and the UK ('TOP') EPSRC £3,987,295 Dec. 1, 2015 May 31, 2019 Closed 33 SPECIFIC IKC Phase 2 EPSRC £4,996,546 March 31, 2016 March 30, 2023 Active 34 SPECIFIC IKC Phase 2 EPSRC £14,988,165 March 31, 2016 March 31, 2025 Active 35 High-Rise Buildings: Energy and Density EPSRC £911,750 Nov. 1, 2015 March 31, 2017 Closed 36 Advanced structural health monitoring for stone masonry structures - bringing new technology closer to market EPSRC £176,084 March 31, 2011 May 30, 2012 Closed 37 Unlocking the Potential of Model-Predictive Control in Non-domestic Building Energy Management: Automated Configuration and Optimisation of Control EPSRC £1,081,208 July 31, 2016 April 29, 2020 Closed 38 Unlocking the Potential of Model-Predictive Control in Non-domestic Building Energy Management: Automated Configuration and Optimisation of Control EPSRC £2,703,020 July 31, 2016 April 30, 2020 Closed 39 Refresh: Remodeling Building Design Sustainability from a Human Centered Approach EPSRC £3,388,700 June 30, 2013 Sept. 30, 2019 Closed 40 Advanced building façade design for optimal delivery of end use energy demand EPSRC £3,306,214 June 30, 2019 June 29, 2024 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »