Home Projects More like: Polarising designs: Redesigning neodymium magnets (NDM) for the circular economy. [Clear] # Title Funder Funding Start End Status 61 Meteorites as free sample-returns: Operation of the UK Desert Fireball Network STFC £1,503,095 Sept. 27, 2008 Sept. 27, 2011 Closed 62 Testing and optimising a novel wave-energy device EPSRC £0 Sept. 30, 2019 Sept. 30, 2022 Closed 63 The Strain Manipulation of Nanoscale Magnetic Structures EPSRC £1,959,776 Sept. 30, 2009 Sept. 29, 2014 Closed 64 REESilience Horizon Europe Guarantee £1,038,365 June 30, 2022 June 30, 2026 Active 65 Resilient and sustainable critical raw materials REE supply chains for the e-mobility and renewable energy ecosystems and strategic sectors (REESilience) Horizon Europe Guarantee £9,241,345 June 30, 2022 June 30, 2026 Active 66 Transfer Optimisation System for Adaptive Automated Nature-Inspired Optimisation FLF £2,789,840 April 30, 2023 April 30, 2026 Active 67 Beyond Biorecovery: environmental win-win by biorefining of metallic wastes into new functional materials (B3) NERC £265,188 Aug. 28, 2014 May 30, 2018 Closed 68 Beyond biorecovery: environmental win-win by biorefining of metallic wastes into new functional materials (B3) NERC £1,276,114 Aug. 28, 2014 March 31, 2019 Closed 69 Beyond biorecovery: environmental win-win by biorefining of metallic wastes into new functional materials (B3) NERC £620,288 Aug. 28, 2014 March 31, 2019 Closed 70 Beyond biorecovery: environmental win-win by biorefining of metallic wastes into new functional materials (B3) NERC £3,190,285 Aug. 28, 2014 March 31, 2019 Closed 71 Beyond biorecovery: environmental win-win by biorefining of metallic wastes into new functional materials (B3) NERC £1,550,720 Aug. 28, 2014 March 31, 2019 Closed 72 Beyond Biorecovery: environmental win-win by biorefining of metallic wastes into new functional materials (B3) NERC £662,970 Aug. 28, 2014 May 31, 2018 Closed 73 Transfer Optimisation System for Adaptive Automated Nature-Inspired Optimisation FLF £5,488,210 April 30, 2019 April 30, 2023 Closed 74 Powering Carbon-free Autonomous Shipping: Ammonia/Hydrogen dual-fuelled Linear Engine-Generator EPSRC £1,368,486 June 28, 2018 Dec. 30, 2019 Closed 75 Powering Carbon-free Autonomous Shipping: Ammonia/Hydrogen dual-fuelled Linear Engine-Generator EPSRC £905,754 Jan. 1, 2020 Dec. 31, 2021 Closed 76 Biobitumen Feasibility Study Innovate UK £25,200 Dec. 1, 2016 March 30, 2017 Closed 77 Does an ancient circadian clock control transcriptional rhythms using a non-transcriptional oscillator? BBSRC £1,538,374 Sept. 30, 2012 Jan. 31, 2016 Closed 78 Does an ancient circadian clock control transcriptional rhythms using a non-transcriptional oscillator? BBSRC £3,845,935 Sept. 30, 2012 Jan. 31, 2016 Closed 79 Development of superconducting composite permanent magnets for synchronous motors: an enabling technology for future electric aircraft EPSRC £1,019,030 July 31, 2016 Jan. 31, 2020 Closed 80 Development of superconducting composite permanent magnets for synchronous motors: an enabling technology for future electric aircraft EPSRC £2,547,575 July 31, 2016 Jan. 31, 2020 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »