Home Projects More like: Development of a driftless thermometer to improve safety and efficiency in the nuclear power industry [Clear] # Title Funder Funding Start End Status 1 Development of a driftless thermometer to improve safety and efficiency in the nuclear power industry Innovate UK £539,495 Sept. 30, 2014 March 31, 2016 Closed 2 The Development of an Industrial Primary (Johnson Noise) Thermometer Innovate UK £474,592 Sept. 30, 2017 Dec. 31, 2020 Closed 3 New Fuel Assemblies for Advanced Nuclear Technologies EPSRC £1,366,908 Sept. 30, 2021 Sept. 29, 2025 Active 4 New Fuel Assemblies for Advanced Nuclear Technologies EPSRC £3,417,270 Sept. 30, 2021 Sept. 30, 2025 Active 5 Primary thermometry for in-situ traceability EPSRC £0 Sept. 30, 2022 Sept. 29, 2026 Active 6 An investigation into combined film and internal cooling of turbine blades EPSRC £202,340 March 31, 2018 March 30, 2021 Closed 7 Selective Exhaust Gas Recirculation for Carbon Capture with Gas Turbines: Integration, Intensification, Scale-up and Optimisation. EPSRC £2,199,782 Dec. 1, 2014 May 30, 2018 Closed 8 Selective Exhaust Gas Recirculation for Carbon Capture with Gas Turbines: Integration, Intensification, Scale-up and Optimisation. EPSRC £5,499,455 Dec. 1, 2014 May 31, 2018 Closed 9 MAINTAiN - Multi-scAle INTegrity assessment for Advanced high-temperature Nuclear systems EPSRC £1,970,165 March 31, 2018 Sept. 30, 2022 Closed 10 EPSRC Centre for Doctoral Training in Materials for Demanding Environments EPSRC £21,459,405 April 30, 2014 Oct. 31, 2025 Active 11 Active Distributed Temperature Sensing for high-resolution fluid-flow monitoring in boreholes NERC £614,745 March 1, 2014 March 30, 2015 Closed 12 Fault tolerant control for increased safety and security of nuclear power plants EPSRC £878,499 Dec. 1, 2018 Feb. 28, 2022 Closed 13 Fault tolerant control for increased safety and security of nuclear power plants EPSRC £472,296 Sept. 30, 2018 Aug. 30, 2023 Active 14 Fault tolerant control for increased safety and security of nuclear power plants EPSRC £1,464,165 Dec. 1, 2018 Feb. 28, 2022 Closed 15 Study of Supercritical Coal Fired Power Plant Dynamic Responses and Control for Grid Code Compliance EPSRC £3,627,210 Dec. 1, 2009 Jan. 10, 2011 Closed 16 Study of Supercritical Coal Fired Power Plant Dynamic Responses and Control for Grid Code Compliance EPSRC £2,968,295 Feb. 1, 2011 Aug. 15, 2014 Closed 17 High Temperature Zirconium Alloys for Nuclear Fusion and Generation IV Fission Reactors EPSRC £1,508,740 Aug. 31, 2020 Feb. 28, 2023 Closed 18 Redefining power generation from carbonaceous fuels with carbonate looping combustion and gasification technologies EPSRC £314,424 July 31, 2017 June 29, 2019 Closed 19 Redefining power generation from carbonaceous fuels with carbonate looping combustion and gasification technologies EPSRC £786,060 July 31, 2017 June 30, 2019 Closed 20 In-Situ Test of High Temperature Pipes in Nuclear Power Plant (UltraHotTest) Innovate UK £96,200 Nov. 1, 2016 Jan. 31, 2017 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »