Home Projects More like: Intelligent Coatings for Energy-Efficient Glazing (ICE Glazing) [Clear] # Title Funder Funding Start End Status 1 Low carbon climate-responsive Heating and Cooling of Cities (LoHCool) EPSRC £1,597,972 Sept. 30, 2015 March 31, 2019 Closed 2 Low carbon climate-responsive Heating and Cooling of Cities (LoHCool) EPSRC £3,994,930 Sept. 30, 2015 March 31, 2019 Closed 3 Aerogel composites for carbon capture and thermal management in commercial buildings - Feasibility Study EPSRC £293,084 May 27, 2017 Nov. 27, 2018 Closed 4 Aerogel composites for carbon capture and thermal management in commercial buildings - Feasibility Study EPSRC £732,710 May 27, 2017 Nov. 27, 2018 Closed 5 Integrated heating and cooling networks with heat-sharing-enabled smart prosumers EPSRC £1,712,216 March 31, 2021 March 30, 2025 Active 6 Integrated heating and cooling networks with heat-sharing-enabled smart prosumers EPSRC £4,280,540 March 31, 2021 March 31, 2025 Active 7 Unlocking the Potential of Model-Predictive Control in Non-domestic Building Energy Management: Automated Configuration and Optimisation of Control EPSRC £1,081,208 July 31, 2016 April 29, 2020 Closed 8 Unlocking the Potential of Model-Predictive Control in Non-domestic Building Energy Management: Automated Configuration and Optimisation of Control EPSRC £2,703,020 July 31, 2016 April 30, 2020 Closed 9 Development of a new generation of high efficiency heat pumps using pre-heated air supply EPSRC £122,508 Sept. 30, 2016 Sept. 29, 2017 Closed 10 Development of a new generation of high efficiency heat pumps using pre-heated air supply EPSRC £306,270 Sept. 30, 2016 Sept. 30, 2017 Closed 11 H2-Heat: Thermal energy transport for heating and cooling with innovative hydrogen(H2) technologies EPSRC £1,990,480 Jan. 1, 2021 Dec. 31, 2023 Active 12 H2-Heat: Thermal energy transport for heating and cooling with innovative hydrogen(H2) technologies EPSRC £4,976,200 Jan. 1, 2021 Dec. 31, 2024 Active 13 Thermochemical energy storage using a closed cycle (ThermoStore) EPSRC £1,045,512 Aug. 31, 2020 Aug. 30, 2023 Active 14 Thermochemical energy storage using a closed cycle (ThermoStore) EPSRC £2,613,780 Aug. 31, 2020 Feb. 29, 2024 Active 15 ZnO MESFETs for application to Intelligent Windows EPSRC £1,197,720 May 26, 2013 May 30, 2016 Closed 16 ZnO MESFETs for application to Intelligent Windows EPSRC £2,994,300 May 26, 2013 May 31, 2016 Closed 17 Integrated Infrastructure for Sustainable Thermal Energy Provision (IN-STEP) EPSRC £1,166,214 June 28, 2018 Dec. 12, 2022 Active 18 Advanced building façade design for optimal delivery of end use energy demand EPSRC £3,306,214 June 30, 2019 June 29, 2024 Active 19 Advanced building façade design for optimal delivery of end use energy demand EPSRC £8,265,535 June 30, 2019 June 30, 2024 Active 20 Reframing Energy Demand: Innovation for Sustainable Heat EPSRC £1,161,924 Dec. 31, 2014 Aug. 31, 2018 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 »