# Title Funder Funding Start End Status
41 In situ pilot-scale demonstration of a novel mineral processing biotechnology for recovering metals from lateritic ores (International) NERC
£198,982
Nov. 1, 2017 Dec. 31, 2018 Closed
42 Geology to Metallurgy of Critical Rare Earths: sustainable development of Nd and HREE deposits NERC
£193,270
Aug. 31, 2013 July 9, 2014 Closed
43 Lakes and the arctic carbon cycle NERC
£419,414
July 31, 2012 Jan. 31, 2016 Closed
44 Lakes and the Arctic Carbon Cycle NERC
£538,340
July 31, 2012 Jan. 31, 2016 Closed
45 Lakes and the Arctic Carbon Cycle NERC
£630,548
July 31, 2012 Jan. 31, 2016 Closed
46 Lakes and the Arctic Carbon Cycle NERC
£102,160
Jan. 31, 2013 Jan. 30, 2016 Closed
47 An improved empirical model of soil carbon dynamics in temperate ecosystems NERC
£353,860
Jan. 2, 2007 June 30, 2009 Closed
48 Season extension of UK asparagus using dynamically controlled atmosphere BBSRC
£393,048
Aug. 4, 2015 Aug. 3, 2018 Closed
49 Season extension of UK asparagus using dynamically controlled atmosphere BBSRC
£982,620
Aug. 4, 2015 Aug. 4, 2018 Closed
50 Engineered UK clays for production of low-carbon cements EPSRC
£165,356
June 30, 2022 June 29, 2026 Active
51 Engineered UK clays for production of low-carbon cements EPSRC
£997,934
June 30, 2022 June 29, 2026 Active
52 Engineered UK clays for production of low-carbon cements EPSRC
£857,130
June 30, 2022 June 29, 2026 Active
53 Novel constraints on sources and sinks of methane and carbon monoxide from measurements and modelling of radiocarbon NERC
£668,260
Dec. 1, 2022 Nov. 30, 2025 Active
54 Novel constraints on sources and sinks of methane and carbon monoxide from measurements and modelling of radiocarbon NERC
£3,341,300
Dec. 1, 2022 Nov. 30, 2025 Active
55 The effects of fire on peatland carbon stocks and dynamics NERC
£259,510
Sept. 4, 2007 Oct. 3, 2008 Closed
56 The effects of fire on peatland carbon stocks and dynamics NERC
£648,775
Sept. 4, 2007 Oct. 4, 2008 Closed
57 Quantifying gas-phase losses of carbon from intact and degraded mangrove ecosystems. NERC
£156,554
Jan. 9, 2012 July 7, 2013 Closed
58 MAPPING THE UNDERWORLD: MULTI-SENSOR DEVICE CREATION, ASSESSMENT, PROTOCOLS EPSRC
£778,450
March 1, 2009 Aug. 30, 2013 Closed
59 MAPPING THE UNDERWORLD: MULTI-SENSOR DEVICE CREATION, ASSESSMENT, PROTOCOLS EPSRC
£1,532,220
Nov. 1, 2008 April 29, 2013 Closed
60 MAPPING THE UNDERWORLD: MULTI-SENSOR DEVICE CREATION, ASSESSMENT, PROTOCOLS EPSRC
£33,920
Jan. 13, 2009 Jan. 12, 2013 Closed
Reset