# Title Funder Funding Start End Status
1 Clean Coal Technology: A Novel Process for the Combustion of Coal Using an Oxygen Carrier EPSRC
£1,303,805
April 16, 2006 Oct. 16, 2009 Closed
2 Distributed Hydrogen Production with Carbon Capture: A Novel Process for the Production of Hydrogen from Biomass EPSRC
£351,698
Sept. 30, 2007 March 30, 2009 Closed
3 Hydrogen production via a three-reactor chemical-looping (TRCL) process using perovskite-type oxygen-carrier materials. EPSRC
£0
Sept. 30, 2017 March 29, 2021 Closed
4 Hydrogen production via a three-reactor chemical-looping (TRCL) process using perovskite-type oxygen-carrier materials. EPSRC
£0
Sept. 30, 2017 March 30, 2021 Closed
5 Coal-Air fuel cells and CO2 utilisation EPSRC
£0
Sept. 30, 2016 Oct. 31, 2017 Closed
6 Coal-Air fuel cells and CO2 utilisation EPSRC
£0
Jan. 15, 2018 May 30, 2018 Closed
7 Coal-Air fuel cells and CO2 utilisation EPSRC
£0
Sept. 30, 2016 Oct. 31, 2017 Closed
8 Coal-Air fuel cells and CO2 utilisation EPSRC
£0
Feb. 1, 2018 May 31, 2018 Closed
9 Electrolytic Silicon and Iron Powders as Alternatives to Hydrogen as Energy Carrier and Store EPSRC
£303,878
Aug. 31, 2007 May 30, 2009 Closed
10 Electrolytic Silicon and Iron Powders as Alternatives to Hydrogen as Energy Carrier and Store EPSRC
£759,695
Aug. 31, 2007 May 31, 2009 Closed
11 Porous Dynamic Materials for Energy Applications EPSRC
£188,144
March 7, 2011 March 6, 2012 Closed
12 Porous Dynamic Materials for Energy Applications EPSRC
£470,360
March 7, 2011 March 6, 2012 Closed
13 Graphene Flexible Electronics and Optoelectronics EPSRC
£5,914,572
Feb. 1, 2013 Jan. 31, 2018 Closed
14 Frontier Engineering: Progression Grant in Nature-Inspired Engineering EPSRC
£1,517,966
Dec. 1, 2019 Nov. 30, 2022 Active
15 Minerals for Sustainable COst and energy efficient chemical looping combUstion Technology EPSRC
£842,530
Jan. 1, 2014 May 31, 2016 Closed
16 CO2 Post-Combustion Capture Using Amine Impregnated Synthetic Zeolites EPSRC
£960,510
Jan. 1, 2014 Dec. 31, 2016 Closed
17 Study of Supercritical Coal Fired Power Plant Dynamic Responses and Control for Grid Code Compliance EPSRC
£3,627,210
Dec. 1, 2009 Jan. 10, 2011 Closed
18 Study of Supercritical Coal Fired Power Plant Dynamic Responses and Control for Grid Code Compliance EPSRC
£2,968,295
Feb. 1, 2011 Aug. 15, 2014 Closed
19 A novel supercritical fluid coating method EPSRC
£701,056
Oct. 31, 2008 Oct. 29, 2011 Closed
20 A novel supercritical fluid coating method EPSRC
£1,752,640
Oct. 31, 2008 Oct. 30, 2011 Closed
Reset