Home Projects More like: Clean Coal Technology: A Novel Process for the Combustion of Coal Using an Oxygen Carrier [Clear] # Title Funder Funding Start End Status 1 Clean Coal Technology: A Novel Process for the Combustion of Coal Using an Oxygen Carrier EPSRC £1,303,805 April 16, 2006 Oct. 16, 2009 Closed 2 Distributed Hydrogen Production with Carbon Capture: A Novel Process for the Production of Hydrogen from Biomass EPSRC £351,698 Sept. 30, 2007 March 30, 2009 Closed 3 Hydrogen production via a three-reactor chemical-looping (TRCL) process using perovskite-type oxygen-carrier materials. EPSRC £0 Sept. 30, 2017 March 29, 2021 Closed 4 Hydrogen production via a three-reactor chemical-looping (TRCL) process using perovskite-type oxygen-carrier materials. EPSRC £0 Sept. 30, 2017 March 30, 2021 Closed 5 Coal-Air fuel cells and CO2 utilisation EPSRC £0 Sept. 30, 2016 Oct. 31, 2017 Closed 6 Coal-Air fuel cells and CO2 utilisation EPSRC £0 Jan. 15, 2018 May 30, 2018 Closed 7 Coal-Air fuel cells and CO2 utilisation EPSRC £0 Sept. 30, 2016 Oct. 31, 2017 Closed 8 Coal-Air fuel cells and CO2 utilisation EPSRC £0 Feb. 1, 2018 May 31, 2018 Closed 9 Electrolytic Silicon and Iron Powders as Alternatives to Hydrogen as Energy Carrier and Store EPSRC £303,878 Aug. 31, 2007 May 30, 2009 Closed 10 Electrolytic Silicon and Iron Powders as Alternatives to Hydrogen as Energy Carrier and Store EPSRC £759,695 Aug. 31, 2007 May 31, 2009 Closed 11 Porous Dynamic Materials for Energy Applications EPSRC £188,144 March 7, 2011 March 6, 2012 Closed 12 Porous Dynamic Materials for Energy Applications EPSRC £470,360 March 7, 2011 March 6, 2012 Closed 13 Graphene Flexible Electronics and Optoelectronics EPSRC £5,914,572 Feb. 1, 2013 Jan. 31, 2018 Closed 14 Frontier Engineering: Progression Grant in Nature-Inspired Engineering EPSRC £1,517,966 Dec. 1, 2019 Nov. 30, 2022 Active 15 Minerals for Sustainable COst and energy efficient chemical looping combUstion Technology EPSRC £842,530 Jan. 1, 2014 May 31, 2016 Closed 16 CO2 Post-Combustion Capture Using Amine Impregnated Synthetic Zeolites EPSRC £960,510 Jan. 1, 2014 Dec. 31, 2016 Closed 17 Study of Supercritical Coal Fired Power Plant Dynamic Responses and Control for Grid Code Compliance EPSRC £3,627,210 Dec. 1, 2009 Jan. 10, 2011 Closed 18 Study of Supercritical Coal Fired Power Plant Dynamic Responses and Control for Grid Code Compliance EPSRC £2,968,295 Feb. 1, 2011 Aug. 15, 2014 Closed 19 A novel supercritical fluid coating method EPSRC £701,056 Oct. 31, 2008 Oct. 29, 2011 Closed 20 A novel supercritical fluid coating method EPSRC £1,752,640 Oct. 31, 2008 Oct. 30, 2011 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »